Search MHK Data
111 results (0.002 seconds)
Topics
Technology Types
Testing and Deployment
Data Type
Keywords
Submitted by
order by:
NREL MOIS Data for NWEI Azura August 2015
NREL MOIS data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describi...
National Renewable Energy Laboratory (2016)
May 23, 2016
17 Resources
17 Resources
NREL MOIS Data for NWEI Azura November 2015
NREL MOIS data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describi...
National Renewable Energy Laboratory (2016)
May 25, 2016
16 Resources
16 Resources
MOIS Installation on NWEI Azura Half Scale WEC - WETS Testing Documentation
This submission includes documentation on the Modular Ocean Instrumentation System (MOIS) installation on the Azura 1/2 scale wave energy converter at the Marine Station Kaneohe Bay (MCBH). Data from the deployment will be uploaded over the course of the test. The instrumentatio...
National Renewable Energy Laboratory (2015)
May 30, 2015
7 Resources
7 Resources
Aquantis 2.5 MW Ocean Current Generation Device - MHK Hydrofoils Design, Wind Tunnel Optimization and CFD Analysis Report
Dataset contains MHK Hydrofoils Design and Optimization and CFD Analysis Report for the Aquantis 2.5 MW Ocean Current Generation Device, as well as MHK Hydrofoils Wind Tunnel Test Plan and Checkout Test Report.
Shiu, H. et al Dehlsen Associates, LLC (2015)
Jun 03, 2015
16 Resources
16 Resources
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc. (2016)
Jun 13, 2016
3 Resources
3 Resources
HydroAir Power Take Off Combined Design Report
The submission is the combined design report for the HydroAir Power Take Off (PTO). CAD drawings, circuit diagrams, design report, test plan, technical specifications and data sheets are included for the Main and auxiliary control cabinets and three-phase-synchronous-motor with pe...
Pearson, G. et al Dresser-Rand Company (2015)
Jun 26, 2015
15 Resources
15 Resources
Wave Energy Prize - 1/20th Testing - M3 Wave Submerged Mid-Column Pressure Differential
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the M3 Wave team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necessary me...
Ricardo Detroit Technical Center (2016)
Aug 12, 2016
26 Resources
26 Resources
Wave Energy Prize - 1/50th Testing - Advanced Ocean Energy @ VT Bundled Pipe Terminator WEC
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the for the Advanced Ocean Energy @VT team, and includes:
- 1/50th test data (raw & processed)
- 1/50th test data video and pictures
- 1/50th Test plans and testing documents
...
Ricardo Detroit Technical Center (2016)
Jan 29, 2016
7 Resources
7 Resources
Wave Energy Prize - 1/50th Testing - SEWEC Attenuator
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the SEWEC team, and includes:
- 1/50th test data (raw & processed)
- 1/50th test data video and pictures
- 1/50th Test plans and testing documents
- SSTF_Submission (summarize...
Ricardo Detroit Technical Center (2015)
Dec 11, 2015
6 Resources
6 Resources
Triton Point Absorber 1:30 Scale Tank Test Data for Extreme Wave Environments
This content model summarizes laboratory testing data for the Oscilla Power Triton WEC conducted at 1:30 scale. The WEC was tested in large operational waves and in extreme wave conditions along the 1 in 50 year wave contour at the DoE reference location in Humbolt Bay, CA. The WE...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc. (2018)
Mar 13, 2018
26 Resources
26 Resources