Search MHK Data
Showing results 1 - 6 of 6.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Water Horse Hydroelectric Harvester Dual Oscillator Field Testing Data, UAF Nenana Alaska, 2021
Raw and processed timeseries data generated during field testing of a single "galloping oscillator" Water Horse prototype at PMEC (Pacific Marine Energy Center) Tanana River Test Site in Nenana, AK for 3 weeks in 2021. Data collection by University of Alaska, Fairbanks.
Loeffler, B. et al University of Alaska Fairbanks
Aug 18, 2021
1 Resources
0 Stars
In curation
1 Resources
0 Stars
In curation
Water Horse Hydroelectric Harvester Single Oscillator Field Testing Data, UAF Nenana Alaska, 2020
Raw and processed timeseries data generated during field testing of a single oscillating hydrofoil Water Horse prototype at PMEC (Pacific Marine Energy Center) Tanana River Test Site in Nenana, AK in July 2020. Data collection by University of Alaska, Fairbanks.
Loeffler, B. et al University of Alaska Fairbanks
Jul 10, 2020
1 Resources
0 Stars
In curation
1 Resources
0 Stars
In curation
Tanana River Transects August 2010
As part of the initial site investigation for the Tanana River near Nenana, Alaska, a set of transects was completed on August 10th, 2010. This data was collected with a Rio Grande 1200 Teledyne ADCP the same year the initial bathymetry was collected. This set of transects includ...
DUVOY, P. University of Alaska Fairbanks
Aug 10, 2010
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Tanana River Transects September 2010
As part of the initial site investigation for the Tanana River near Nenana, Alaska, a set of transects was completed on September 23rd, 2010. Similar to the one done on August 10th, 2010. This data was collected with a Rio Grande 1200 Teledyne ADCP the same year the initial bathym...
DUVOY, P. University of Alaska Fairbanks
Sep 23, 2010
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Simulink Model of a New Energy EVG-005 5kW Hydropower Turbine
Simulink model for a New Energy 5kW hydropower turbine.
ADCP data ("ds_streamwise_7_13.nc") and DC voltage, DC current, and rotor rotation observed from the New Energy EVG-005 Current Energy Converter (CEC) ("electrical_7_13_10ohms.nc") were collected at the Tanana River Test Sit...
Browning, E. et al University of Alaska Fairbanks
Jul 13, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
ALFA Field Testing of a Dual Sonar System for Detecting Woody Debris
Field testing of a dual sonar system for detecting woody debris in natural settings was conducted at the Tanana River Test Site (TRTS) in Nenana, AK between 8/26 and 9/23, 2015. The TRTS is approximately 65 miles south of Fairbanks and is well suited for testing hydrokinetic energ...
Kasper, J. University of Alaska Fairbanks
Apr 11, 2022
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible