Search MHK Data
Showing results 1 - 5 of 5.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
HydroAir Power Take Off Combined Design Report
The submission is the combined design report for the HydroAir Power Take Off (PTO). CAD drawings, circuit diagrams, design report, test plan, technical specifications and data sheets are included for the Main and auxiliary control cabinets and three-phase-synchronous-motor with a ...
Pearson, G. et al Dresser-Rand Company
Jun 26, 2015
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
Centipod WEC Design for PacWave, Performance and Load Calculations
This submission compiles the 2024 Centipod wave energy converter (WEC) design results for PacWave South. It includes a Significant Wave Height-Energy Period (Hs-Te) power matrix for the designed device, array-level performance estimates, and System Advisor Model (SAM) reports with...
McCall, A. Dehlsen Associates, LLC
Dec 05, 2025
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
TEAMER: Deeply Embedded Ring Anchor Fatigue Life Optimization
The data provided in this submission contain the analysis input files and result post-processing spreadsheets and scripts to perform the CFD analysis, load case development, strength FEA, fatigue FEA, and optimization tasks outlined in the project report. Below is a summary of the...
Mane, S. et al Stress Engineering Services, Inc.
Jun 15, 2026
4 Resources
0 Stars
Curated
4 Resources
0 Stars
Curated