LCOE Baseline for OE Buoy WEC Device
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the Ocean Energy ...
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LCOE Baseline for Wave Carpet WEC Device
This is an LCOE (levelized cost of energy) baseline assessment for the Wave Carpet.
Previsic, M. et al Re Vision Consulting
Jul 26, 2017