M3 Wave DMP/APEX WEC Projected LCOE

Abstract
Projected LCOE model based on information gained during project performance.
1 Resource

Related Datasets

Datasets associated with the same DOE project
  Submission Name Resources Submitted Status

Additional Info

DOE Project Name: Improved Survivability and Lower Cost in Submerged Wave Energy Device
DOE Project Number: EE0007345
DOE Project Lead: Tim Ramsey
DOI: 10.15473/1492967
Last Updated: 6 months ago
Aug
2018
Data from August, 2018
Submitted Oct 1, 2018

M3 Wave

Contact

971.770.6626
All Resources Available Sep 30, 2020

Authors

Mike Morrow
M3 Wave
Mike Delos-Reyes
M3 Wave

Keywords

MHK, Marine, Hydrokinetic, energy, power, economics, LCOE, COE, cost, levelized, baseline, initial capital cost, operations and maintenance, replacement cost, net annual energy production, foundation, air chambers, air turbine, generator, deployment, control, permits, transmission, subsea pod, removal bond, construction insurance, sensitivity, demo project, commercial, small array, ICC, LRC, OM, AEP, net, M3 Wave, APEX, DMP, Delos-Reyes Morrow Pressure, WEC, wave, ocean, converter, harvester, submerged, pressure differential, stationary, seabed mounted, gravity base, projected, capacity factor

Status

Awaiting release License 

Share

Submission Downloads