Specified System Requirements for the HydroAir Power Take Off System

Abstract

Includes Annual Energy Production of the system, Target Availability of the system, the system's PWR (power to weight ratio), Critical Dimensions and Weights (e.g. center of gravity and center of buoyancy, capture length) of the system, the system's Noise Levels, and All Grid Requirements (e.g. tolerance to variation in frequency output, flicker, etc.) for the system.

1 Resource

Related Datasets

Datasets associated with the same DOE project
  Submission Name Resources Submitted Status

Additional Info

DOE Project Name: HydroAir Power Take Off System
DOE Project Number: EE0006609
DOE Project Lead: Erik Mauer
Last Updated: 2 months ago
Oct
2020
Data from October, 2020
Submitted Jul 26, 2021

Contact

Siemens Government Technologies, Inc.


720.327.6867

Status

Awaiting release License 
All Resources Available Oct 2, 2025

Authors

Shahab Natanzi
Siemens Energy
Russell Hall
Siemens Energy

Keywords

MHK, Marine, Hydrokinetic, energy, power, Hydrokinetic marine energy power, PTO, availability, PWR, power to weight ratio, WEC, wave energy, turbine, dimensions, noise levels, noise attenuation, energy production, grid requirements, power take off