LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer

Abstract

The overarching project objective is to demonstrate the feasibility of using an innovative Power-Take-Off (PTO) Module in Columbia Power?s utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; a patent-pending rail-bearing system; and a corrosion-resistant fiber-reinforced-plastic structure.

12 Resources

Related Datasets

Datasets associated with the same DOE project
  Submission Name Resources Submitted Status

Additional Info

DOE Project Name: BUILD AND TEST OF A NOVEL, COMMERCIAL-SCALE WAVE ENERGY DIRECT-DRIVE ROTARY POWER TAKE-OFF UNDER REALISTIC OPEN-OCEAN CONDITIONS
DOE Project Number: EE0006399
DOE Project Lead: Yana Shininger
Last Updated: 3 months ago
Nov
2020
Data from November, 2020
Submission in progress

Contact

Columbia Power Technologies, Inc.


541.368.5033

Status

In progress License 

Authors

This submission does not list any authors.

Keywords

MHK, Marine, Hydrokinetic, direct-drive, power-take-off, PTO, renewable energy, wave energy converter, offshore, grid-connection, reliability, performance, Dynamometer

Share

Export Citation to RIS
Submission Downloads