Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over Period A which was a 39 day span ending on 11/12/2021. This data was collected under the European Marine Energy Centre (EMEC) power performance assessment. Along with performance data, the data includes setup data, project metadata, and characteristic data for RITE Gen5 KHPS (5m) turbine.
1 Resource
Additional Info
DOE Project Name: Integrated Development and Comprehensive IO&M Testing at RITE of a KHPS TriFrame Mount
DOE Project Number: EE0007349
DOE Project Lead: Yana Shininger
DOE Project Number: EE0007349
DOE Project Lead: Yana Shininger
DOI: 10.15473/1830229