CalWave Holistic PTO Design - Product Requirement Document

Abstract

CalWave Power Technologies is currently in the process of developing the conceptual architecture for a fully upscaled Wave Energy Converter. Current and past efforts have been for smaller scaled systems, with commensurately lower forces and length scales. This document contains a high level summary of the PTO product requirements.

1 Resource

Related Datasets

Datasets associated with the same DOE project
  Submission Name Resources Submitted Status

Additional Info

DOE Project Name: CalWave Holistic Control Embedded PTO design
DOE Project Number: EE0008632
DOE Project Lead: Yana Shininger
Last Updated: 7 months ago
Dec
2021
Data from December, 2021
Submitted Dec 6, 2021

Contact

CalWave Power Technologies Inc.


Status

Awaiting release License 
All Resources Available Dec 7, 2026

Authors

Nigel Kojimoto
CalWave Power Technologies Inc.
Marcus Lehmann
CalWave Power Technologies Inc.
Dan Petcovic
CalWave Power Technologies Inc.
Josiah Clark
CalWave Power Technologies Inc.

Keywords

MHK, Marine, Hydrokinetic, energy, power, wave, CalWave, PTO, power take off, WEC, wave energy converter, product requirements, performance, functional, requirements, IEC, IEEE, guidlines, design, design constraints

Share

Export Citation to RIS
Submission Downloads