Data sets from simulation runs include 144 wave cases that were run based on the WEC-Sim model (https://mhkdr.openei.org/submissions/483). The 144 wave cases represent waves with the following wave height and wave period ranges:

- Significant Wave Height: 0.25 - 4.0m in 0.25m increments
- Wave Period: 5 - 13 sec in 1 sec increments

Each run was simulated using a Pierson-Moskowitz irregular wave spectrum with a 200 second ramp time and a total simulation time of 2,200 seconds.

Summary data set includes a spreadsheet and image files with matrices that are associated with data from simulation runs. All matrices cover the same significant wave height and wave periods from the sim runs, in the same increments. The following matrices are included:

- Mechanical Power Input: Absorbed power calculated using linear input velocity at PTO (power take-off) multiplied by winch tension.
- Mechanical Power Output: The hydraulic power calculated at the pump output prior to the pressure relief valve dump.
- Feed Pressure: Average pressure at RO (reverse osmosis) input prior to pre-filters
- RO Power Input: The hydraulic power calculated at the RO system inlet, accounts for flow loss due to pressure relief valve
- Water Production: Average clean water flow at RO output

Citation Formats

National Renewable Energy Laboratory. (2022). HERO WEC V1.0 - WEC-Sim Detailed Simulation Runs and Summary Data [data set]. Retrieved from https://dx.doi.org/10.15473/1985891.
Export Citation to RIS
Jenne, Scott. HERO WEC V1.0 - WEC-Sim Detailed Simulation Runs and Summary Data. United States: N.p., 12 Aug, 2022. Web. doi: 10.15473/1985891.
Jenne, Scott. HERO WEC V1.0 - WEC-Sim Detailed Simulation Runs and Summary Data. United States. https://dx.doi.org/10.15473/1985891
Jenne, Scott. 2022. "HERO WEC V1.0 - WEC-Sim Detailed Simulation Runs and Summary Data". United States. https://dx.doi.org/10.15473/1985891. https://mhkdr.openei.org/submissions/485.
@div{oedi_485, title = {HERO WEC V1.0 - WEC-Sim Detailed Simulation Runs and Summary Data}, author = {Jenne, Scott.}, abstractNote = {Data sets from simulation runs include 144 wave cases that were run based on the WEC-Sim model (https://mhkdr.openei.org/submissions/483). The 144 wave cases represent waves with the following wave height and wave period ranges:

- Significant Wave Height: 0.25 - 4.0m in 0.25m increments
- Wave Period: 5 - 13 sec in 1 sec increments

Each run was simulated using a Pierson-Moskowitz irregular wave spectrum with a 200 second ramp time and a total simulation time of 2,200 seconds.

Summary data set includes a spreadsheet and image files with matrices that are associated with data from simulation runs. All matrices cover the same significant wave height and wave periods from the sim runs, in the same increments. The following matrices are included:

- Mechanical Power Input: Absorbed power calculated using linear input velocity at PTO (power take-off) multiplied by winch tension.
- Mechanical Power Output: The hydraulic power calculated at the pump output prior to the pressure relief valve dump.
- Feed Pressure: Average pressure at RO (reverse osmosis) input prior to pre-filters
- RO Power Input: The hydraulic power calculated at the RO system inlet, accounts for flow loss due to pressure relief valve
- Water Production: Average clean water flow at RO output }, doi = {10.15473/1985891}, url = {https://mhkdr.openei.org/submissions/485}, journal = {}, number = , volume = , place = {United States}, year = {2022}, month = {08}}
https://dx.doi.org/10.15473/1985891

Details

Data from Aug 12, 2022

Last updated Jul 12, 2023

Submitted May 5, 2023

Organization

National Renewable Energy Laboratory

Contact

Scott Jenne

303.384.7248

Authors

Scott Jenne

National Renewable Energy Laboratory

DOE Project Details

Project Name Wave-Powered Desalination Deployment & Analysis

Project Lead Simon Gore

Project Number FY23 AOP 2.2.6.404

Share

Submission Downloads