TidGen: Single Turbine Test Procedure and Data Acquisition Plan
The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80.
Citation Formats
TY - DATA
AB - The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80.
AU - Hayes, Nathanial
DB - Marine and Hydrokinetic Data Repository
DP - Open EI | National Renewable Energy Laboratory
DO -
KW - MHK
KW - Marine
KW - Hydrokinetic
KW - energy
KW - power
KW - TidGen
KW - Single Turbine System
KW - STS
KW - TD80
KW - Advanced TidGen
KW - test procedure
KW - mooring
KW - commissioning
KW - fixed torque control
KW - fixed speed control
KW - decommissioning
KW - data acquisition
KW - SCADA
KW - contingency planning
KW - development
KW - tidal
LA - English
DA - 2021/06/03
PY - 2021
PB - Ocean Renewable Power Company
T1 - TidGen: Single Turbine Test Procedure and Data Acquisition Plan
UR - https://mhkdr.openei.org/submissions/538
ER -
Hayes, Nathanial. TidGen: Single Turbine Test Procedure and Data Acquisition Plan. Ocean Renewable Power Company, 3 June, 2021, Marine and Hydrokinetic Data Repository. https://mhkdr.openei.org/submissions/538.
Hayes, N. (2021). TidGen: Single Turbine Test Procedure and Data Acquisition Plan. [Data set]. Marine and Hydrokinetic Data Repository. Ocean Renewable Power Company. https://mhkdr.openei.org/submissions/538
Hayes, Nathanial. TidGen: Single Turbine Test Procedure and Data Acquisition Plan. Ocean Renewable Power Company, June, 3, 2021. Distributed by Marine and Hydrokinetic Data Repository. https://mhkdr.openei.org/submissions/538
@misc{MHKDR_Dataset_538,
title = {TidGen: Single Turbine Test Procedure and Data Acquisition Plan},
author = {Hayes, Nathanial},
abstractNote = {The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80.},
url = {https://mhkdr.openei.org/submissions/538},
year = {2021},
howpublished = {Marine and Hydrokinetic Data Repository, Ocean Renewable Power Company, https://mhkdr.openei.org/submissions/538},
note = {Accessed: 2025-05-07}
}
Details
Data from Jun 3, 2021
Last updated Apr 25, 2024
Submitted Feb 27, 2024
Organization
Ocean Renewable Power Company
Contact
Jarlath McEntee
207.772.7707
Authors
Keywords
MHK, Marine, Hydrokinetic, energy, power, TidGen, Single Turbine System, STS, TD80, Advanced TidGen, test procedure, mooring, commissioning, fixed torque control, fixed speed control, decommissioning, data acquisition, SCADA, contingency planning, development, tidalDOE Project Details
Project Name Advanced TidGen Power System
Project Lead Yana Shininger
Project Number EE0007820