TidGen: Single Turbine Test Procedure and Data Acquisition Plan
The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80.
Citation Formats
Ocean Renewable Power Company. (2021). TidGen: Single Turbine Test Procedure and Data Acquisition Plan [data set]. Retrieved from https://mhkdr.openei.org/submissions/538.
Hayes, Nathanial. TidGen: Single Turbine Test Procedure and Data Acquisition Plan. United States: N.p., 03 Jun, 2021. Web. https://mhkdr.openei.org/submissions/538.
Hayes, Nathanial. TidGen: Single Turbine Test Procedure and Data Acquisition Plan. United States. https://mhkdr.openei.org/submissions/538
Hayes, Nathanial. 2021. "TidGen: Single Turbine Test Procedure and Data Acquisition Plan". United States. https://mhkdr.openei.org/submissions/538.
@div{oedi_538, title = {TidGen: Single Turbine Test Procedure and Data Acquisition Plan}, author = {Hayes, Nathanial.}, abstractNote = {The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80.}, doi = {}, url = {https://mhkdr.openei.org/submissions/538}, journal = {}, number = , volume = , place = {United States}, year = {2021}, month = {06}}
Details
Data from Jun 3, 2021
Last updated Apr 25, 2024
Submitted Feb 27, 2024
Organization
Ocean Renewable Power Company
Contact
Jarlath McEntee
207.772.7707
Authors
Keywords
MHK, Marine, Hydrokinetic, energy, power, TidGen, Single Turbine System, STS, TD80, Advanced TidGen, test procedure, mooring, commissioning, fixed torque control, fixed speed control, decommissioning, data acquisition, SCADA, contingency planning, development, tidalDOE Project Details
Project Name Advanced TidGen Power System
Project Lead Yana Shininger
Project Number EE0007820