Search MHK Data
Showing results 1 - 11 of 11.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
RivGen Open Water Installation Report
The purpose of the Open Water Deployment Report is to provide an overview of the installation of the Ocean Renewable Power Company (ORPC) RivGen 2.0 Power System in Igiugig, AK, in 2019 beginning with the transportation of the system to Igiugig and ending with the deployment of th...
Tyler, R. Igiugig Village Council
Nov 01, 2019
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization, Igiugig, AK
During the summer and fall of 2011 TerraSond Ltd. (TerraSond) completed a bathymetric survey and hydrokinetic energy assessment of the Kvichak River at Igiugig, Alaska. The purpose of this work was to characterize the initial site conditions for the design and installation of a hy...
McEntee, J. Ocean Renewable Power Company
Oct 01, 2015
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
CalWave Open Water Demonstration Field Testing Content Models (10/21 7/22)
Data for the CalWave Open Water Demonstration, a submerged pressure differential Wave Energy Converter (WEC) Device. Device is moored to the seabed, and the motion of the waves causes the sea level to rise and fall above the device, inducing a pressure differential in the device. ...
Boerner, T. et al CalWave Power Technologies Inc.
Jul 31, 2022
10 Resources
0 Stars
Curated
10 Resources
0 Stars
Curated
Underwater Videos of the Oscylator-4 Installation and Operation from 2016
This data set contains video recorded from the under water camera on the Oscylator-4. The device was installed in the St. Clair River in Port Huron MI in 2016.
Taipale, J. Vortex Hydro Energy
Apr 11, 2017
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
MOIS Installation on NWEI Azura Half Scale WEC WETS Testing Documentation
This submission includes documentation on the Modular Ocean Instrumentation System (MOIS) installation on the Azura 1/2 scale wave energy converter at the Marine Station Kaneohe Bay (MCBH). Data from the deployment will be uploaded over the course of the test. The instrumentatio...
Nelson, E. National Renewable Energy Laboratory
May 30, 2015
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
In-Situ Blade Strain Measurements of a Crossflow Turbine Operating in a Tidal Flow
This data was collected between October 25 and December 12 of 2022 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). The priority of this measurement campaign was to collect blade strain data from a crossflow turbi...
Bharath, A. et al National Renewable Energy Laboratory
Dec 16, 2022
15 Resources
0 Stars
Awaiting curation
15 Resources
0 Stars
Awaiting curation
Admiralty Inlet Hub-Height Turbulence Measurements from June 2012
This data is from measurements at Admiralty Head, in Admiralty Inlet. The measurements were made using an IMU equipped ADV mounted on a mooring, the 'Tidal Turbulence Mooring' or 'TTM'. The inertial measurements from the IMU allows for removal of mooring motion in post processing....
Kilcher, L. National Renewable Energy Laboratory
Jun 18, 2012
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Hydrokinetic Canal Measurements: Inflow Velocity, Wake Flow Velocity, and Turbulence
The dataset consist of acoustic Doppler current profiler (ADCP) velocity measurements in the wake of a 3-meter diameter vertical-axis hydrokinetic turbine deployed in Roza Canal, Yakima, WA, USA. A normalized hub-centerline wake velocity profile and two cross-section velocity con...
Gunawan, B. Sandia National Laboratories
Jun 11, 2014
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Admiralty Inlet Advanced Turbulence Measurements: June 2014
This data is from measurements at Admiralty Head, in Admiralty Inlet (Puget Sound) in June of 2014. The measurements were made using Inertial Motion Unit (IMU) equipped ADVs mounted on Tidal Turbulence Mooring's (TTMs). The TTM positions the ADV head above the seafloor to make mid...
Kilcher, L. National Renewable Energy Laboratory
Jun 30, 2014
26 Resources
0 Stars
Publicly accessible
26 Resources
0 Stars
Publicly accessible
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible
Admiralty Inlet Advanced Turbulence Measurements: May 2015
This data is from measurements at Admiralty Head, in Admiralty Inlet (Puget Sound) in May of 2015. The measurements were made using Inertial Motion Unit (IMU) equipped ADVs mounted on a 'StableMoor' (Manufacturer: DeepWater Buoyancy) buoy and a Tidal Turbulence Mooring (TTM). Thes...
Kilcher, L. National Renewable Energy Laboratory
May 18, 2015
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible