Search MHK Data
Showing results 1 - 2 of 2.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
TEAMER: Over-voltage Protection of Direct Drive Wave Power System (WPS) Electrical Components Restricted Release
Restricted release data, results, and final report from a study on methods to design and optimize an over-voltage protection (OVP) system for a floating, two-body Wave Power System (WPS). The work has been performed by assessing the conditions under which hydrodynamically induced ...
Swindler, S. et al Cardinal Engineering
May 01, 2026
4 Resources
0 Stars
Curated
4 Resources
0 Stars
Curated