Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison with this project's baseline LCOE model.
7 Resources
AEP Resultant MPC.xlsx
Annual Energy Production - Combines mechanical power matrix with a Northern California resource Joint Probability Distribution (JPD) and losses to produce AEP for the r... more
This links to MHKDR Submission 70, the baseline LCOE model after implementation of MPC controller. Contains AEP, CBS, model documentation, and LCOE content model. This ... more