Centipod WEC, Advanced Controls, Baseline LCOE

Abstract

Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, built after implementation of the model predictive control (MPC) controller.

7 Resources

Related Datasets

Datasets associated with the same DOE project
  Submission Name Resources Submitted Status

Additional Info

DOE Project Name: Advanced Controls for the Multi-pod Centipod WEC device
DOE Project Number: EE0006404
DOE Project Lead: Tim Ramsey
DOI: 10.15473/1493766
Last Updated: 3 months ago
Feb
2016
Data from February, 2016
Submitted Feb 16, 2016

Contact

Dehlsen Associates, LLC


805.845.0496

Status

Awaiting release License 
All Resources Available Feb 15, 2021

Authors

Alan McCall
Dehlsen Associates LLC

Keywords

MHK, Marine, Hydrokinetic, energy, power, Wave, WEC, LCOE, AEP, MPC, Controls, Northern California, wave energy, converter, levelized cost of energy, cost of energy, economics, multiple, point, absorber, cost, point absorber, Centipod, annual energy production, model predictive control, cost breakdown structure, CBS, multi-pod, point absorber buoy, Dehlsen, advanced, baseline

Share

Export Citation to RIS
Submission Downloads