Advanced TidGen Power System Preliminary IO&M and Testing Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Single Turbine Test Procedure and Data Acquisition Plan
This document describes the test procedure and the data acquisition plan for the Single Turbine Subsystem (STS) testing that is part of the Advanced TidGen Power System. The goal of the Advanced TidGen Power System is to demonstrate a commercially viable tidal power system, integr...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine System Performance Analysis
This document offers a detailed performance analysis of the Single Turbine System (STS) developed by ORPC in Cobscook Bay, Maine, in 2023. The report includes system descriptions, deployment, and planned instrumentation, alongside data collection strategies. The performance evalua...
McEntee, J. Ocean Renewable Power Company
Jan 11, 2024
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine System (STS) Deployment and Mooring Report
This document provides a summary for the performance of the deployment and mooring systems for a single turbine test system (STS) deployed by the Ocean Renewable Power Company (ORPC) in Cobscook Bay, Maine in 2023.
Pillsbury, L. Ocean Renewable Power Company
Jan 05, 2024
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Single Turbine Test Procedure and Data Acquisition Plan, Rev. B
The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80. This document describes the te...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
RivGen Power System Overview, Igiugig, AK
System description of ORPC RivGen(R) Power System utilized at Igiugig, AK for testing of advanced controls
McEntee, J. Ocean Renewable Power Company
Aug 05, 2014
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Material Set Selection
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
LCOE and Baseline Data for ORPC's RivGen 1.F River Power System
Base data and documentation of LCOE calculations for ORPC's RivGen 1.F Power System, demonstrated in the Kvichak River at Igiugig, Alaska in 2015.
Salmon, A. Igiugig Village Council
Oct 31, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Reference Model 5 Full Scale Geometry (RM5: Oscillating Surge Flap)
Contains the Reference Model 5 (RM5) full scale geometry files of the Oscillating Surge Flap, developed by the Reference Model Project (RMP). These full scale geometry files are saved as SolidWorks assembly, IGS, and STEP files, and require a CAD program to view. This data was gen...
Neary, V. et al Sandia National Laboratories
Sep 30, 2014
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
TidGen: Single Turbine Test Procedure and Data Acquisition Plan
The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. In...
Hayes, N. Ocean Renewable Power Company
Jun 03, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Environmental Assessment
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. et al Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
MOIS Installation on NWEI Azura Half Scale WEC WETS Testing Documentation
This submission includes documentation on the Modular Ocean Instrumentation System (MOIS) installation on the Azura 1/2 scale wave energy converter at the Marine Station Kaneohe Bay (MCBH). Data from the deployment will be uploaded over the course of the test. The instrumentatio...
Nelson, E. National Renewable Energy Laboratory
May 30, 2015
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
TidGen: Permits for Installation of Single Turbine Test System, Cobscook Bay, Maine
This is a summary of permits required and obtained for installation, operation, removal of the TidGen Single Turbine Test system in Cobscook Bay, May in 2023. The Ocean Renewable Power Company (ORPC) worked with federal and state entities to gain required permits and approvals tha...
Sellers-Reynolds, K. Ocean Renewable Power Company
Feb 27, 2024
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Final Technical Report
Final Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeling.
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Holistic Control Embedded PTO Development Target Performance Metrics Definitions
Collection of Power Take-Off (PTO), Power Conversion Chain (PCC), and relevant device metrics to be used for performance assessment of the Control co-designed PTO including brief summary of literature, baseline, and target metrics values.
Boerner, T. et al CalWave Power Technologies Inc.
Jul 30, 2019
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
RivGen Deployment Control System Specifications and Models, Igiugig, AK
Control System simulation models, case studies, and processing codes for analyzing field data. Raw data files included from VFD and SCADA.
MatLab and Simulink are required to open some data files and all model files.
Forbush, D. et al Ocean Renewable Power Company
Mar 21, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Numerical Survivability Report Baseline Geometry
Summary of numerical survivability modeling method for the baseline geometry of the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX."
Roberts, J. et al M3 Wave
Aug 16, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
RivGen Open Water Installation Report
The purpose of the Open Water Deployment Report is to provide an overview of the installation of the Ocean Renewable Power Company (ORPC) RivGen 2.0 Power System in Igiugig, AK, in 2019 beginning with the transportation of the system to Igiugig and ending with the deployment of th...
Tyler, R. Igiugig Village Council
Nov 01, 2019
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
RANS Simulation VBM of Single Lab Scaled DOE RM1 MHK Turbine
Attached are the .cas and .dat files for the Reynolds Averaged Navier-Stokes (RANS) simulation of a single lab-scaled DOE RM1 turbine implemented in ANSYS FLUENT CFD-package.
The lab-scaled DOE RM1 is a re-design geometry, based of the full scale DOE RM1 design, producing same po...
Javaherchi, T. et al University of Washington (NNMREC)
Apr 15, 2014
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
RANS Simulation VBM of Array of Three Coaxial Lab Scaled DOE RM1 MHK Turbine with 5D Spacing
Attached are the .cas and .dat files along with the required User Defined Functions (UDFs) and look-up table of lift and drag coefficients for the Reynolds Averaged Navier-Stokes (RANS) simulation of three coaxially located lab-scaled DOE RM1 turbine implemented in ANSYS FLUENT CF...
Javaherchi, T. University of Washington
Jun 08, 2016
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
TEAMER: FOSWEC Mooring Modeling and Analysis, Post Access Report and Data
Floating oscillating surge wave energy converters (FOSWECs) offer several advantages over bottom-hinged oscillating surge wave energy converters, including large wave potential at deep-water sites with fewer permitting and environmental concerns outside territorial waters. As a te...
Housner, S. et al Virginia Tech
Jun 14, 2022
10 Resources
0 Stars
Curated
10 Resources
0 Stars
Curated
TEAMER: Drifting Hydrophone System Block Diagram and Pre-Amplifier Calibrations
This data release is part of TEAMER RFTS 2, where the Cooperative Institute for Marine Resources Studies (CIMRS) at Oregon State University is performing hardware and software development and integration of four newly designed drifting hydrophone systems for underwater noise measu...
Turnbull, J. et al Pacific Marine Energy Center (PMEC) / PacWave Oregon State University
Feb 26, 2024
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Next Generation Concept Drawings
This is the preliminary concepts that formed the basis of the first round of numerical modeling and technical discussions for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." IGES wireframes will be uploaded also. Additional hybrid concepts ...
Morrow, M. M3 Wave
Sep 21, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Downselected System Overviews
In 2014, open water testing revealed that sediment scour around and under the device was significant and likely interrupted operations. To explore methods to mitigate this phenomenon, M3 developed a number of alternate concepts as detailed in concept sketches. This submission incl...
Morrow, M. and Delos-Reyes, M. M3 Wave
Sep 29, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TidGen MHK Generator Composite Fatigue Analysis Procedure
A procedure was described for performing a fatigue analysis of composite foils for an MHK generator. The steps included generating load data, S-N (Stress versus Number of cycles to failure) diagrams through fatigue testing, cycle counts, damage versus load, and cumulative damage. ...
Krumpe, A. ORPC Inc.
Apr 14, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible