Search MHK Data
Showing results 151 - 155 of 155.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Laboratory Upgrade Point Absorber WEC-Sim Model with MoorDyn Moorings
This dataset includes a WEC-Sim and MoorDyn model of the Laboratory Upgrade Point Absorber (LUPA). LUPA is an open-source wave energy converter designed and tested by Oregon State University. The files provided here constitute a stable LUPA configuration with three mooring lines. ...
Mcconnell, A. Oregon State University
Oct 08, 2024
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
HERO WEC V1.0 SolidWorks Model
The attached zip file includes a SolidWorks pack-and-go assembly of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter) V1.0. This model does not include all aspects of the design (i.e. RO (reverse osmosis) system, electrical enclosure, hose, cable) it o...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
ALFA: SWIFT Buoy Data Under Extreme Wave Conditions at the Newport South Energy Test Site
Full data set (six deployments) from the Surface Wave Instrument Float With Tracking (SWIFT) buoy deployments at the Newport South Energy Test Site during extreme wave events.
Thomson, J. Northwest National Marine Renewable Energy Center
May 01, 2017
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated
HERO WEC V1.0 Electrical PTO Deployment Data and Analysis
This submission includes the processed and raw field electrical data from NREL's August 2022 HERO WEC (hydraulic and electric reverse osmosis wave energy converter) deployment at Jennette's Pier for the electrical PTO (power take-off).
Nakhai, A. et al National Renewable Energy Laboratory
Aug 12, 2022
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible