2023 Risk Management Plan and Register for Low-Power WEC for Non-Grid Applications
This is an updated risk management plan and risk register for the design, build and test of a novel, remote, low-power wave energy converter (WEC) for non-grid applications. This Columbia Power Technologies project seeks to develop a prototype low-power WEC that lowers the total c...
Hammagren, E. et al Columbia Power Technologies, Inc.
Jun 14, 2023
17 Resources
0 Stars
Awaiting release
17 Resources
0 Stars
Awaiting release
StingRAY Structural Optimization Final Technical Report Appendices
The protected data appendices to the public Final Technical Report.
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing stru...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
16 Resources
0 Stars
Awaiting release
16 Resources
0 Stars
Awaiting release
Tidal Energy Resource Characterization, Bottom Lander Measurements, Cook Inlet, AK, 2021
These datasets are from tidal resource characterization measurements collected on the Terrasond High Energy Oceanographic Mooring (THEOM) from 1 July 2021 to 30 August 2021 (60 days) in Cook Inlet, Alaska. The lander was deployed at 60.7207031 N, 151.4294998 W in ~50 m of water.
...
Kilcher, L. and McVey, J. National Renewable Energy Laboratory
Jul 01, 2021
25 Resources
0 Stars
Publicly accessible
25 Resources
0 Stars
Publicly accessible
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible