OpenEI: Energy Information
  • Marine and Hydrokinetic Data Repository
  • My User
    • Sign Up
    • Login
MHK logo
  • Data
    • View All Submissions
    • Data Lakes
    • Content Models
    • Submit Data
  • Help
    • Frequently Asked Questions
    • Data Submission Best Practices
    • Data Submission Tutorial Videos
    • Contact MHKDR Help
  • About
  • Search

Search MHK Data

Showing results 1 - 8 of 8.
Show results per page.
Order by:
Available Now:
Filters Clear All Filters ×
Technologies
Topics
Signature Projects
Collection Method
Data Type
"automated detection"×
TEAMER×

TEAMER: Field Demonstration of MarineSitu Marine Energy Monitoring Tools (Public)

This submission contains data collected during a four-month field demonstration (July-October 2024) of MarineSitu's Adaptable Monitoring Package (AMP) at the Pacific Northwest National Laboratory (PNNL) Marine and Coastal Research Laboratory (MCRL) in Sequim, WA. The project evalu...
Joslin, J. et al MarineSitu
Jun 15, 2026
0 Resources
0 Stars
In progress

TEAMER: Underwater Target Detection Software Demonstration on the RivGen Turbine

This repository includes data, object detection models, and processing scripts necessary to evaluate the accuracy of the object detection models created for the underwater target detection software demonstration on the RivGen turbine project and to reproduce the performance metric...
Joslin, J. et al MarineSitu
Dec 17, 2024
4 Resources
1 Stars
Curated

TEAMER: CalWave UMaine 2021 Tank Testing

This is the data submission to the teamer report for RFTS 1 (request for technical support) during which tank testing at UMaine W2 tank occurred. This submission includes the relevant information and recorded data of CalWave's UMaine wave tank testing conducted under TEAMER Reques...
Boerner, T. CalWave Power Technologies Inc.
Apr 01, 2021
1 Resources
0 Stars
Awaiting release

TEAMER: Field Demonstration of MarineSitu Marine Energy Monitoring Tools

This submission contains data collected during a four-month field demonstration (July-October 2024) of MarineSitu's Adaptable Monitoring Package (AMP) at the Pacific Northwest National Laboratory (PNNL) Marine and Coastal Research Laboratory (MCRL) in Sequim, WA. The project evalu...
Murphy, P. et al MarineSitu
Jul 01, 2024
8 Resources
0 Stars
Curated

TEAMER: Numerical Modeling and Optimization of the iProTech Pitching Inertial Pump (PIP) Wave Energy Converter (WEC)

This project focused on developing an automated workflow to evaluate and optimize the iProTech Pitching Inertial Pump (PIP) wave energy converter (WEC) using open-source Python packages and the MATLAB/Simulink tool, WEC-Sim. The process involved parameterizing key design variables...
Wynn, N. et al National Renewable Energy Laboratory
Apr 11, 2024
2 Resources
0 Stars
Curated

TEAMER: Weekly Reports for Environmental Monitoring and Data Analysis around a Tidal Energy Converter in Sequim Bay, WA

This dataset includes weekly reports pertaining to the Turbine Lander and Lander Adaptable Monitoring Package (LAMP) deployments in Sequim Bay, WA (2023-2024). Optical and sonar images and videos pertaining to all identified events of interest have been uploaded to a separate MH...
Murphy, P. et al MarineSitu
Jul 22, 2025
3 Resources
0 Stars
Curated

TEAMER: Laboratory Evaluation of Dual-Function Oscillating Water Column with Slotted Breakwater O.H. Hinsdale Wave Research Laboratory

This dataset documents a series of controlled laboratory experiments conducted at the O.H. Hinsdale Wave Research Laboratory to evaluate the performance of a dual-function Oscillating Water Column (OWC) system integrated with a slotted breakwater. The experiments aimed to characte...
Walker, M. and Lomonaco, P. University of Hawaii at Manoa
Aug 02, 2025
11 Resources
0 Stars
Curated

Turbine Lander Deployment in Sequim Bay (2023-2024): Optical and Sonar Records of Animal Interactions

This dataset contains environmental monitoring data collected during the deployment of the Turbine Lander, a small-scale vertical-axis, cross-flow turbine (1.19 m x 0.85 m) in the inlet to Sequim Bay, Washington. The turbine was deployed for 141 days between October 2023 and March...
Bassett, C. and Cotter, E. University of Washington Applied Physics Laboratory
Mar 07, 2024
6 Resources
0 Stars
Curated
  • About the MHKDR
  • Partners & Sponsors
  • Disclaimers
  • Developer Services
  • The MHKDR is the submission point for all data collected from research funded by the U.S. Department of Energy's Marine and Hydrokinetic Power Program.
  • Content is available under Creative Commons Attribution 4.0 unless otherwise noted.

Privacy Policy Notification

This site uses cookies to store and share user preferences with other OpenEI sites, and uses Google Analytics to collect anonymous user information such as which pages are visited, for how often, and what searches or other webpages may have led users here. You can prevent Google Analytics from recognizing you on return visits to this site by disabling cookies on your browser or by installing a Google Analytics Opt-out Browser Add-on. By clicking "Accept" you agree this site can store cookies on your device and disclose information to OpenEI and Google Analytics in accordance with our privacy policy.

OpenEI Privacy Policy Google Analytics Terms of Service