NWEI Azura July 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Aug 31, 2016
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura August 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Oct 14, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura September 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Oct 15, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura October 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Nov 11, 2016
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura November 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Dec 07, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Turbine Depth Optimization Study, Admiralty Inlet, WA
The zipped file contains a directory of data and routines used in the NNMREC turbine depth optimization study (Kawase et al., 2011), and calculation results thereof. For further info, please contact Mitsuhiro Kawase at kawase@uw.edu.
Kawase, M. et al University of Washington
Nov 22, 2009
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Oscilla Power Triton 1310 System Overview and Baseline LCOE Calculations
This project aims to enhance survivability of a multi-mode point absorber. Included in this submission are content models providing a system definition and baseline LCOE calculations.
Mundon, T. Oscilla Power, Inc.
Jan 03, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
AquaHarmonics WEC 1:20 Scale Tank Test Data
Data from tank tests collected using AquaHarmonics 1:20 scale model that occurred in June and October 2018.
Hagmuller, A. AquaHarmonics
Oct 29, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
NWEI Azura March 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
May 18, 2018
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Device Configuration Drawings
Configurations as tested and modeled in final phase of project for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX."
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 08, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TEAMER: Maximal Asymmetric Drag Wave Energy Converter
Boundary element method (BEM) and WEC-Sim analysis of UMass Dartmouth's maximal asymmetric drag wave energy converter (MADWEC), including its tethered ballast system and PTO (power take-off).
This project is part of the TEAMER RFTS 6 (request for technical support) program.
MacDonald, D. et al University of Massachusetts Dartmouth
Aug 18, 2023
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
Centipod WEC, Advanced Controls, Final Technical Report
Final Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeling.
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
StingRAY System and LCOE Content Models
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
CalWave Open Water Demonstration System and Component Overview Content Models and Drawings
Data for the CalWave Open Water Demonstration, a submerged pressure differential Wave Energy Converter (WEC) Device. Device is moored to the seabed, and the motion of the waves causes the sea level to rise and fall above the device, inducing a pressure differential in the device. ...
Boerner, T. et al CalWave Power Technologies Inc.
Dec 06, 2022
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
MHK Levelized Cost of Energy (LCOE) Guidance and Techo Economic Analysis Materials
Useful information and tools for calculating the Levelized Cost of Energy (LCOE) and MHK Cost Breakdown Structure. Includes a structure for calculating the capital expenditures and operating costs of a marine energy technology or device, reference resource data for both wave and ...
Jenne, S. and Baca, E. National Renewable Energy Laboratory
Nov 08, 2019
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
NWEI Azura June 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of O'ahu, HI. See general documentation describing ...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Full Scale Mooring Analysis Report and Specifications
This dataset contains the Aquantis 2.5 MW Ocean Current Generation Device full scale mooring analysis report and specifications.
Arthurs, D. Dehlsen Associates, LLC
Jun 03, 2015
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
NWEI Azura April 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
May 18, 2018
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
CalWave Deep Ocean Basin Test Plan, Ireland
Documentation of CalWave's wave tank test plan (including test setup and overview) at the Deep Ocean Basin at Ringaskiddy, Cork, Ireland. Experimental tank testing of scaled prototype units will be conducted repeatedly throughout the design process to verify device performance for...
Boerner, T. et al CalWave Power Technologies Inc.
Oct 31, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Reference Model 2 Scaled Geometry (RM2: River Current Turbine)
Contains the Reference Model 2 (RM2) scaled scale geometry files of the River Current Turbine, developed by the Reference Model Project (RMP). These scaled geometry files are saved as SolidWorks assembly, IGS, and STEP files, and require a CAD program to view. The scaled RM2 devic...
Neary, V. and Hill, C. Sandia National Laboratories
Sep 30, 2014
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Downselection Report
This downselect report follows the progression from initial concept pool to final concepts moving forward to tank testing for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Included is a brief discussion of anticipated impacts of the 3 final...
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 01, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Numerical Survivability Report Baseline Geometry
Summary of numerical survivability modeling method for the baseline geometry of the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX."
Roberts, J. et al M3 Wave
Aug 16, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC 1:50 Small Scale Tank Testing Plan
Detailed laboratory test plan for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Includes test points, materials and methods, and sensors/telemetry to be used. Includes schematics of test apparatus and sensor type and locations.
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 17, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave Design for PacWave Preliminary Design Phase Risk Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan ...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
CalWave Revised IO&M Plan CalWave Open Water Demo
Revised IO&M Plan for CalWave's open water demonstration at Scripps Institution of Oceanography for the open water demonstration to be conducted in collaboration with University of California, San Diego (UCSD) near the Scripps Institute of Oceanography (SIO) pier, in a water dept...
Petcovic, D. et al CalWave Power Technologies Inc.
Jun 02, 2020
1 Resources
0 Stars
Awaiting release