Search MHK Data
Showing results 1 - 2 of 2.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
LCOE Baseline for OE Buoy WEC Device
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the Ocean Energy ...
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER RFTS5 Triton Systems: OWC modeling support
This is the output of 6 WEC-Sim simulations and documentation for the modeling of Triton Systems' OWC system at tank scale (for which there is validation data allowing tuning of the model, tests 1-2) and deployment scale (for which there is not, tests 4-6). Please see the included...
Forbush, D. et al Sandia National Laboratories
Aug 30, 2024
2 Resources
0 Stars
In curation
2 Resources
0 Stars
In curation