Modular RivGen LCOE Content Model
The Modular RivGen LCOE Content Model contains estimates of levelized cost of energy (LCOE) for three array configurations operating in a theoretical river environment. The LCOE is distinguished by the CapEx, OpEx, and annual energy production and capture for each river environment.
Tyler, R. and Obomsawin, T. Ocean Renewable Power Company
Dec 15, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
M3 Wave DMP/APEX WEC Projected LCOE
Projected LCOE model for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," based on information gained during project performance.
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 01, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible