Search MHK Data
Showing results 1 - 5 of 5.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Evaluation of a Wave Powered Water Pump Performance by Ocean Field Testing and WEC-Sim Modeling
This submission from AMEC (the Atlantic Marine Energy Center) includes data from an ocean field deployment of a wave powered water pump in March 2023. The wave pump is an upweller device, designed to enhance macroalgal aquaculture.
The wave pump device was deployed off the coast ...
Kimball, C. et al University of New Hampshire, Atlantic Marine Energy Center (AMEC)
Mar 21, 2023
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
HERO WEC V1 Upgrades SolidWorks Models (WEC, RO System, and Submersible Pump Housing)
The attached zip files include SolidWorks pack-and-go assemblies of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter), the reverse osmosis (RO) assembly, and the submersible pump assembly that is used to provide flow to the RO assembly in the electric ...
Jenne, S. and Panzarella, J. National Renewable Energy Laboratory
Jan 08, 2024
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 WEC-Sim Detailed Simulation Runs and Summary Data
Data sets from simulation runs include 144 wave cases that were run based on the WEC-Sim model (https://mhkdr.openei.org/submissions/483). The 144 wave cases represent waves with the following wave height and wave period ranges:
Significant Wave Height: 0.25 4.0m in 0.25m incre...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 Electrical PTO Deployment Data and Analysis
This submission includes the processed and raw field electrical data from NREL's August 2022 HERO WEC (hydraulic and electric reverse osmosis wave energy converter) deployment at Jennette's Pier for the electrical PTO (power take-off).
Nakhai, A. et al National Renewable Energy Laboratory
Aug 12, 2022
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
The core objectives of this project is to improve the power capture of three different wave energy
conversion (WEC) devices by more than 50% using an advanced control system and validate the
attained improvements using wave tank and full scale testing. In parallel, we will bring a...
Previsic, M. et al Re Vision Consulting
Aug 26, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible