StingRAY Updated WEC Risk Registers

Abstract
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
17 Resources

Related Datasets

Datasets associated with the same DOE project
  Submission Name Resources Submitted Status

Additional Info

DOE Project Name: REDUCTION OF SYSTEM COST CHARACTERISTICS THROUGH INNOVATIVE SOLUTIONS TO INSTALLATION, OPERATIONS, AND MAINTENANCE
DOE Project Number: EE0007347
DOE Project Lead: Tim Ramsey
DOI: 10.15473/1513769
Last Updated: 5 months ago
Jun
2018
Data from June, 2018
Submitted Jun 27, 2018

Columbia Power Technologies, Inc.

Contact

541.368.5033
All Resources Available Jun 27, 2023

Authors

Ken Rhinefrank
Columbia Power Technologies Inc.
Michael Ondusko
Columbia Power Technologies Inc.

Keywords

MHK, Marine, Hydrokinetic, energy, power, FMECA, Installation, Operation, Maintenance, Cost Reduction, Risk Register, wave energy, converter, wave, StingRAY, Columbia Power Technologies, direct-drive, single-point mooring, magnet generator, hull, mooring, system, electric plant, safety, ballast, control, PTO, climate, outfit, furnishing, power-take-off, module, surveillance, station power, electrical collection, fitting, cooling, bilge, penetrations, operations, technology, risk management, attenuator, point, absorber

Status

Awaiting release License 

Share

Submission Downloads