Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Admiralty Inlet Hub-Height Turbulence Measurements from June 2012
This data is from measurements at Admiralty Head, in Admiralty Inlet. The measurements were made using an IMU equipped ADV mounted on a mooring, the 'Tidal Turbulence Mooring' or 'TTM'. The inertial measurements from the IMU allows for removal of mooring motion in post processing....
Kilcher, L. National Renewable Energy Laboratory
Jun 18, 2012
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
MBARI-WEC September and October 2022 Field Data
This data is needed to simulate a model of the MBARI-WEC (Monterey Bay Aquarium Research Institute, Wave Energy Converter device) in a simulation environment (e.g. Gazebo) for 56 observation dates in the time between September and October 2022, and to compare the simulation output...
Dizon, C. et al Oregon State University
Sep 07, 2022
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Admiralty Inlet Advanced Turbulence Measurements: May 2015
This data is from measurements at Admiralty Head, in Admiralty Inlet (Puget Sound) in May of 2015. The measurements were made using Inertial Motion Unit (IMU) equipped ADVs mounted on a 'StableMoor' (Manufacturer: DeepWater Buoyancy) buoy and a Tidal Turbulence Mooring (TTM). Thes...
Kilcher, L. National Renewable Energy Laboratory
May 18, 2015
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible
Admiralty Inlet Advanced Turbulence Measurements: June 2014
This data is from measurements at Admiralty Head, in Admiralty Inlet (Puget Sound) in June of 2014. The measurements were made using Inertial Motion Unit (IMU) equipped ADVs mounted on Tidal Turbulence Mooring's (TTMs). The TTM positions the ADV head above the seafloor to make mid...
Kilcher, L. National Renewable Energy Laboratory
Jun 30, 2014
26 Resources
0 Stars
Publicly accessible
26 Resources
0 Stars
Publicly accessible
Oscylator-4 Energy Converter St. Clair River Installation Data 2016
Data collected during the 2016 St. Clair River installation of the Oscylator-4 energy converter.
Taipale, J. and Kim, E. Vortex Hydro Energy
Jul 20, 2016
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible
Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization, Igiugig, AK
During the summer and fall of 2011 TerraSond Ltd. (TerraSond) completed a bathymetric survey and hydrokinetic energy assessment of the Kvichak River at Igiugig, Alaska. The purpose of this work was to characterize the initial site conditions for the design and installation of a hy...
McEntee, J. Ocean Renewable Power Company
Oct 01, 2015
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
In-Situ Blade Strain Measurements of a Crossflow Turbine Operating in a Tidal Flow
This data was collected between October 25 and December 12 of 2022 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). The goal was to collect blade strain data from a crossflow turbine operating in a tidal flow. A t...
Bharath, A. et al National Renewable Energy Laboratory
Dec 16, 2022
17 Resources
0 Stars
Curated
17 Resources
0 Stars
Curated
Ocean Sentinel Mooring and Environmental Data 2013
Load cell data of Ocean Sentinel (OS) mooring, OS locations data and environmental conditions data (wave, wind, current) measured in the 2013 field test.
C., S. Oregon State University
Jul 29, 2013
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
RivGen Open Water Installation Report
The purpose of the Open Water Deployment Report is to provide an overview of the installation of the Ocean Renewable Power Company (ORPC) RivGen 2.0 Power System in Igiugig, AK, in 2019 beginning with the transportation of the system to Igiugig and ending with the deployment of th...
Tyler, R. Igiugig Village Council
Nov 01, 2019
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Underwater Videos of the Oscylator-4 Installation and Operation from 2016
This data set contains video recorded from the under water camera on the Oscylator-4. The device was installed in the St. Clair River in Port Huron MI in 2016.
Taipale, J. Vortex Hydro Energy
Apr 11, 2017
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Hydrokinetic Canal Measurements: Inflow Velocity, Wake Flow Velocity, and Turbulence
The dataset consist of acoustic Doppler current profiler (ADCP) velocity measurements in the wake of a 3-meter diameter vertical-axis hydrokinetic turbine deployed in Roza Canal, Yakima, WA, USA. A normalized hub-centerline wake velocity profile and two cross-section velocity con...
Gunawan, B. Sandia National Laboratories
Jun 11, 2014
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
NWEI Azura February 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
May 11, 2018
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Tidal Current Cross-flow Turbine Wake ADV and PIV Data
Measurements in the wake of a high-solidity cross-flow turbine in a laboratory flume obtained using Acoustic Doppler Velocimetry and Particle Image Velocimetry for the purposes of characterizing the turbine wake and comparing the methods.
Polagye, B. University of Washington
Dec 06, 2016
6 Resources
1 Stars
Publicly accessible
6 Resources
1 Stars
Publicly accessible
NWEI Azura July 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura Aug 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of O'ahu, HI. See general documentation describing ...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura Sept 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura Oct 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura December 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of O'ahu, HI. See general documentation describing ...
Lettenmaier, T. Northwest Energy Innovations
Feb 21, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura January 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing s...
Lettenmaier, T. Northwest Energy Innovations
Jan 01, 2016
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura February 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing s...
Lettenmaier, T. Northwest Energy Innovations
Mar 07, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura March 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Mar 31, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura April 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Jun 08, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura May 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Jun 07, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible