Search MHK Data
Showing results 76 - 80 of 80.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
TEAMER: Tidal Turbine Test, Downeast Turbines, July 12, 2021
Downeast Turbines tested a tidal turbine prototype with novel rotor/channel system and lateral effluent discharge apparatus (LEDA), during five days of testing in the flume at Alden Lab. Three days of testing (July 12-14, 2021) focused on turbine power metrics of torque and rpm, w...
McBride, G. Downeast Turbines
Mar 26, 2022
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
TEAMER: Experimental Characterization of a Laboratory-Scaled Oscillating Surge Wave Energy Converter
This data is a result of an experimental campaign to characterize the hydrodynamics and performance of a laboratory-scale oscillating surge wave energy converter (OSWEC). The device was 85 cm wide, 1.4 meters tall, and 14 cm thick and was tested in the Sea Wave Environmental Lab (...
Lydon, B. et al University of Washington
Apr 05, 2024
9 Resources
0 Stars
Curated
9 Resources
0 Stars
Curated
TEAMER: Mass of Water Turbine Current Energy Converter CFD Results
The CFD (computational fluid dynamics) results for the Mass of Water Turbine (MOWT) current energy converter from MWNW Consulting (formerly Ecosse IP). Each case is self-contained in its own tar.gz archive file. The archive contains the scripts required to perform a full simulati...
Chartrand, C. and Moir, S. Sandia National Laboratories
May 27, 2022
75 Resources
0 Stars
Publicly accessible
75 Resources
0 Stars
Publicly accessible
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible
Tidal Energy Resource Characterization, Bottom Lander Measurements, Cook Inlet, AK, 2021
These datasets are from tidal resource characterization measurements collected on the Terrasond High Energy Oceanographic Mooring (THEOM) from 1 July 2021 to 30 August 2021 (60 days) in Cook Inlet, Alaska. The lander was deployed at 60.7207031 N, 151.4294998 W in ~50 m of water.
...
Kilcher, L. and McVey, J. National Renewable Energy Laboratory
Jul 01, 2021
25 Resources
0 Stars
Publicly accessible
25 Resources
0 Stars
Publicly accessible