Search MHK Data
Showing results 1 - 7 of 7.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
H3 StingRAY Final Design and Technical Report Section 13 Appendices
These documents are referenced in the public version of the H3 StingRAY Final Design and Technical Report (Linked Dataset can be found in Resources section, below), and are submitted separately to allow for public release of head document. The display names have the corresponding ...
Lenee-Bluhm, P. and Prudell, J. Columbia Power Technologies, Inc.
Sep 15, 2023
53 Resources
0 Stars
Awaiting release
53 Resources
0 Stars
Awaiting release
H3 StingRAY Final Design and Technical Report
The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies' (C-Power) next-generation wave energy converter (WEC), the StingRAY H3. The H3 is a design iteration of C-Power's StingRAY WEC and is intended for electrical pow...
Prudell, J. and Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Sep 15, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
StingRAY Structural Optimization Final Technical Report Appendices
The protected data appendices to the public Final Technical Report.
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing stru...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
16 Resources
0 Stars
Awaiting release
16 Resources
0 Stars
Awaiting release
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
StingRAY Structural Optimization Final Technical Report
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing structural material and manufacturing costs and increasing energy output. ...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficient...
Rhinefrank, K. Columbia Power Technologies, Inc.
Jul 25, 2016
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible