Search MHK Data
Showing results 1 - 4 of 4.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
HERO WEC V1 Upgrade 2023 Laboratory Testing (Raw Data)
This submission contains the original, unprocessed data from the 2023 Large Amplitude Motion Platform (LAMP) testing of NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This data serves as a companion to MHKDR #520.
Data was collected using NREL's Mo...
Jenne, S. et al National Renewable Energy Laboratory
Jan 01, 2024
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
Laboratory Upgrade Point Absorber WEC-Sim Model with MoorDyn Moorings
This dataset includes a WEC-Sim and MoorDyn model of the Laboratory Upgrade Point Absorber (LUPA). LUPA is an open-source wave energy converter designed and tested by Oregon State University. The files provided here constitute a stable LUPA configuration with three mooring lines. ...
Mcconnell, A. Oregon State University
Oct 08, 2024
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
H3 StingRAY Final Design and Technical Report Section 13 Appendices
These documents are referenced in the public version of the H3 StingRAY Final Design and Technical Report (Linked Dataset can be found in Resources section, below), and are submitted separately to allow for public release of head document. The display names have the corresponding ...
Lenee-Bluhm, P. and Prudell, J. Columbia Power Technologies, Inc.
Sep 15, 2023
53 Resources
0 Stars
Awaiting release
53 Resources
0 Stars
Awaiting release
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible