Search MHK Data
Showing results 101 - 125 of 139.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Wave Energy Prize 1/50th Testing Oscilla Power Triton Point Absorber
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Oscilla Power team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_Submission (summa...
Scharmen, W. Ricardo Detroit Technical Center
Jan 08, 2016
65 Resources
0 Stars
Publicly accessible
65 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura August 2015
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 23, 2016
17 Resources
0 Stars
Publicly accessible
17 Resources
0 Stars
Publicly accessible
Triton Point Absorber 1:30 Scale Tank Test Data for Extreme Wave Environments
This content model summarizes laboratory testing data for the Oscilla Power Triton WEC conducted at 1:30 scale. The WEC was tested in large operational waves and in extreme wave conditions along the 1 in 50 year wave contour at the DoE reference location in Humbolt Bay, CA. The WE...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Mar 13, 2018
26 Resources
0 Stars
Publicly accessible
26 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura July 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, H...
Nelson, E. National Renewable Energy Laboratory
Sep 25, 2016
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
UMass 2-Body WEC Techno-Economic Assessment
The University of Massachusetts (UMass) is developing a 2-body wave energy converter (WEC) device that is converting mechanical power into electricity using a mechanical motion rectifier that allows the system to couple to a flywheel. UMass has completed numerical modeling, wave t...
Previsic, M. Re Vision Consulting
Nov 19, 2024
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
StingRAY WEC Risk Register
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. Columbia Power Technologies, Inc.
Feb 24, 2017
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing Super Watt Wave Catcher Barge Attenuator
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Super Watt Wave Catcher Barge team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_S...
Scharmen, W. Ricardo Detroit Technical Center
Dec 04, 2015
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 WEC-Sim Model
This zip file contains the files that are needed to simulate NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter). This requires the user to have already installed WEC-Sim. In addition to the standard toolboxes that are required to run WEC-Sim the user wi...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
CalWave WEC Open Water Demonstration Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
1 Stars
Curated
2 Resources
1 Stars
Curated
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 WEC-Sim Model (July 2024)
**This submission supersedes submission MHKDR-483**
This submission file contains the files that are needed to simulate NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter). This requires the user to have already installed WEC-Sim. In addition to the sta...
Panzarella, J. et al National Renewable Energy Laboratory
Jul 01, 2024
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
CalWave WEC Open Water Demonstration Public Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
Azura WEC 1/15th Wave Tank Test Data
Test data from the 1/15th Wave Tank Tests of the Azura performed in 2017/2018 to validate the power performance and survivability of the Azura Design developed by Northwest Energy Innovations (NWEI) planned for deployment at the US Navy's Wave Energy Test Site. Raw and processed d...
Ling, B. Northwest Energy Innovations
Feb 02, 2018
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
TEAMER: CalWave UMaine 2021 Tank Testing
This is the data submission to the teamer report for RFTS 1 (request for technical support) during which tank testing at UMaine W2 tank occurred. This submission includes the relevant information and recorded data of CalWave's UMaine wave tank testing conducted under TEAMER Reques...
Boerner, T. CalWave Power Technologies Inc.
Apr 01, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
StingRAY Updated WEC Risk Registers
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. and Ondusko, M. Columbia Power Technologies, Inc.
Jun 27, 2018
17 Resources
0 Stars
Publicly accessible
17 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing AquaHarmonics Point Absorber
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the AquaHarmonics team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necess...
Scharmen, W. Ricardo Detroit Technical Center
Sep 02, 2016
69 Resources
0 Stars
Publicly accessible
69 Resources
0 Stars
Publicly accessible
Advanced WEC Dynamics and Controls, Test 1
Numerous studies have shown that advanced control of a wave energy converter's (WEC's) power take off (PTO) can provide significant increases (on the order of 200-300%) in WEC energy absorption. Transitioning these control approaches from simplified paper studies to application in...
Coe, R. Sandia National Laboratories
Feb 26, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
NWEI Azura RTI 1/20th Model Validation Wave Tank Test Data
Data from the 1/20th wave tank test of the RTI model. Northwest Energy Innovations (NWEI) has licensed intellectual property from RTI, and modified the PTO and retested the 1/20th RTI model that was tested as part of the Wave Energy Prize. The goal of the test was to validate NWEI...
Ling, B. and Lettenmaier, T. Northwest Energy Innovations
May 08, 2017
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
SeaRAY WEC Preliminary Design and Test Planning
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides...
Hammagren, E. et al Columbia Power Technologies, Inc.
May 18, 2020
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
WEC Controls Optimization Final Report
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be cons...
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Aug 26, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
H3 StingRAY Final Design and Technical Report
The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies' (C-Power) next-generation wave energy converter (WEC), the StingRAY H3. The H3 is a design iteration of C-Power's StingRAY WEC and is intended for electrical pow...
Prudell, J. and Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Sep 15, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Additional Degree of Freedom for WEC Model
'Additional Degree of Freedom for WEC' WEC-Sim numerical model from RFTS 1 (request for technical support) TEAMER project. An increase in wave energy converter (WEC) efficiency requires not only consideration of the nonlinear effects in the WEC dynamics and the power take-off (PTO...
McCall, A. et al Dehlsen Associates, LLC
May 26, 2022
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficient...
Rhinefrank, K. Columbia Power Technologies, Inc.
Jul 25, 2016
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
CalWave WEC Holistic PTO Design
This project aims to advance the Technology Readiness Level (TRL) of CalWave’s commercial scale Power Take-Off (PTO) subsystem through further increasing the level of coupling in physical PTO and concurrent controls design. This is achieved by incorporating a systematic holistic...
Boerner, T. et al CalWave Power Technologies Inc.
Sep 02, 2022
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release