Search MHK Data
Showing results 26 - 50 of 444.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
CalWave Design For PacWave Preliminary Design Phase Project Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. For the Preliminary Design Phase, the Project Management Plan outlines the project objectives, broader impacts, project tasks and timeline, c...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Holistic PTO Design Product Requirement Document
CalWave Power Technologies is currently in the process of developing the conceptual architecture for a fully upscaled Wave Energy Converter. Current and past efforts have been for smaller scaled systems, with commensurately lower forces and length scales. This document contains a ...
Kojimoto, N. et al CalWave Power Technologies Inc.
Dec 06, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Single Turbine Test Procedure and Data Acquisition Plan
This document describes the test procedure and the data acquisition plan for the Single Turbine Subsystem (STS) testing that is part of the Advanced TidGen Power System. The goal of the Advanced TidGen Power System is to demonstrate a commercially viable tidal power system, integr...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Stage 2 Full-Scale Rotary Magnetic Gear for a Marine Hydrokinetic Generator
The goal of this project is to design, fabricate, and test a hermetically sealed 50 kilowatt (kW) multistage magnetically geared generator (MGG). This project will benefit MHK device developers by providing an MHK PTO that overcomes the reliability concerns of the mechanical gears...
Bird, J. Portland State University
Jul 30, 2021
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
Advanced TidGen Power System 2.0 Presentation of System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Development Test Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Summary Presentation
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
May 10, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
StingRAY H1 Humboldt Cost Breakdown Structure
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
StingRAY System and LCOE Content Models
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
RivGen Current Flow Measurements, Igiugig, AK
Measurements of flow velocity, distribution and turbulence conducted by University of Washington Applied Physics Laboratory, Igiugig, Alaska, Summer 2014
Thomson, J. et al Ocean Renewable Power Company
Nov 03, 2014
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
HERO WEC Belt Test Data
The following submission includes raw and processed data from the 2024 HERO WEC belt tests conducted using NREL's Large Amplitude Motion Platform (LAMP).
National Renewable Energy Laboratory
Jan 01, 1970
0 Resources
0 Stars
In progress
0 Resources
0 Stars
In progress
Advanced TidGen Power System OpenFOAM Version 5 CFD Case Files
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System ORPC Public Technical Report, Device Design
Technical report for public dissemination on the design progress for the Advanced TidGen(R) Power System.
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 27, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
LCOE and Baseline Data for ORPC's RivGen 1.F River Power System
Base data and documentation of LCOE calculations for ORPC's RivGen 1.F Power System, demonstrated in the Kvichak River at Igiugig, Alaska in 2015.
Salmon, A. Igiugig Village Council
Oct 31, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Triton-C WEC Numerical and LCOE Content Models (DDP)
These are the Content Models for the Triton-C multi-mode point absorber WEC based on the Detailed System Design Package (DDP), including WEC Numerical and LCOE Content Models.
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Dec 21, 2020
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
TidGen: Single Turbine System (STS) Deployment and Mooring Report
This document provides a summary for the performance of the deployment and mooring systems for a single turbine test system (STS) deployed by the Ocean Renewable Power Company (ORPC) in Cobscook Bay, Maine in 2023.
Pillsbury, L. Ocean Renewable Power Company
Jan 05, 2024
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Preliminary Turbine Hydrodynamic Design
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System 2.0 Final BP1 Turbine Design Technical Report
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Final System Design Technical Report
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
RITE Gen5 KHPS Performance Period A
Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over Period A which was a 39 day span ending on 11/12/2021. This data was collected under the European Marine Energy Centre (EMEC) power ...
Colby, J. et al Verdant Power Inc.
Nov 12, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Design of high deflection foils for MHK applications CFD files
The Ocean Renewable Power Company's (ORPC's) goal is to design, develop, and test hydrofoils with large deflections. The effects of the deflections on cross-flow turbine performance would be evaluated in order to inform design considerations for full-scale water turbines and other...
Barrington, M. and McEntee, J. Ocean Renewable Power Company
Jun 01, 2021
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Control of an AUV with deployable energy-harvesting kite
This paper examines the control of an autonomous underwater vehicle (AUV) with a deployable energy-harvesting kite for oceanographic observation and surveillance. The proposed design and control strategies specifically address objectives of achieving high-payload, long-endurance A...
Reed, J. et al North Carolina State University
Sep 02, 2019
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
RivGen Open Water Installation Report
The purpose of the Open Water Deployment Report is to provide an overview of the installation of the Ocean Renewable Power Company (ORPC) RivGen 2.0 Power System in Igiugig, AK, in 2019 beginning with the transportation of the system to Igiugig and ending with the deployment of th...
Tyler, R. Igiugig Village Council
Nov 01, 2019
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TidGen: Turbine Production Report
The report below provides a comprehensive overview of the production process for the first TidGen turbine. The turbine is composed of several key components, including carbon fiber foils, e-glass struts, and a steel shaft. The report covers the production of each of these elements...
Barrington, M. Ocean Renewable Power Company
Jan 30, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Deep Ocean Basin Test Plan, Ireland
Documentation of CalWave's wave tank test plan (including test setup and overview) at the Deep Ocean Basin at Ringaskiddy, Cork, Ireland. Experimental tank testing of scaled prototype units will be conducted repeatedly throughout the design process to verify device performance for...
Boerner, T. et al CalWave Power Technologies Inc.
Oct 31, 2022
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated