Search MHK Data
Showing results 26 - 50 of 111.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
NWEI Azura August 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Oct 14, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura September 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Oct 15, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura October 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Nov 11, 2016
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura November 2016 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Dec 07, 2016
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura March 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
May 18, 2018
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
RITE Gen5 KHPS Levelized Cost of Energy
Levelized Cost of Energy analysis for Verdant Power Gen5 KHPS utilizing annualized AEP based on actual energy generation at the RITE Project during 2020-21. The WEC devices analyzed include attenuator, point absorber, oscillating wave surge converter, oscillating water column, ove...
Corren, D. et al Verdant Power Inc.
Jun 22, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Triton-C Point Absorber Preliminary System Design Package
Preliminary System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
Mundon, T. Oscilla Power, Inc.
Dec 01, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
NWEI Azura June 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawai'i (MCBH) on the windward (northeast) coast of the island of O'ahu, HI. See general documentation describing ...
Lettenmaier, T. Northwest Energy Innovations
Dec 14, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura April 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
May 18, 2018
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI Azura May 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Jul 23, 2018
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura June 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Jul 31, 2018
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
NWEI AZURA Data for March 2018 Measured by MOIS (NREL)
Performance data (motion, power, mooring loads, position, heading, MOIS status) for the AZURA WEC operating at the Hawaii Wave Energy Test Site (WETS). Measured by Modular Ocean Instrumentation System (MOIS). These data are for the month of March 2018.
Channel descriptions are in...
Driscoll, R. National Renewable Energy Laboratory
Sep 30, 2018
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
Performance estimation of resonance-enhanced dual-buoy wave energy converter using coupled time-domain simulation
This paper presents the modeling methodology and performance evaluation of the resonance-enhanced dual-buoy WEC (Wave Energy Converter) by HEM (hydrodynamic & electro-magnetic) fully-coupled-dynamics time-domain-simulation program. The numerical results are systematically compared...
Kang, H. et al Texas A&M University
Aug 31, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
NWEI AZURA Data for April 2018 Measured by MOIS (NREL)
Performance data (motion, power, mooring loads, position, heading, MOIS status) for the AZURA WEC operating at the Hawaii Wave Energy Test Site (WETS). Measured by Modular Ocean Instrumentation System (MOIS). These data are for the month of April 2018.
Channel descriptions are i...
Driscoll, R. National Renewable Energy Laboratory
Sep 30, 2018
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
H3 StingRAY Final Design and Technical Report
The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies' (C-Power) next-generation wave energy converter (WEC), the StingRAY H3. The H3 is a design iteration of C-Power's StingRAY WEC and is intended for electrical pow...
Prudell, J. and Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Sep 15, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
NWEI Azura November 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 15, 2015
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Triton: Survivability Enhancement of a Multi-Mode Point Absorber
The overall goal of this project was to design and validate a survival mode for the Triton WEC that allows for a reduction in peak loads, while simultaneously allowing for a reduction of capital cost due to the elimination of overdesign to account for uncertainty. In addition, the...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Sep 28, 2018
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
NWEI AZURA Data for February 2018 Measured by MOIS (NREL)
Performance data (motion, power, mooring loads, position, heading, MOIS status) for the AZURA WEC operating at the Hawaii Wave Energy Test Site (WETS). Measured by Modular Ocean Instrumentation System (MOIS). These data are for the month of February 2018. Note that the WEC was dep...
Driscoll, R. National Renewable Energy Laboratory
Sep 30, 2018
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
CalWave Device Behavior in Different Sea States from Scaled Tank Testing
This submission contains a summary of tank test derived WEC device behavior in different irregular sea states.
CalWave sought to conduct experimental tank testing of scaled prototype units early on in the design process to obtain a first estimation of device performance for sea ...
Boerner, T. and Murray, B. CalWave Power Technologies Inc.
Mar 30, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 SolidWorks Model
The attached zip file includes a SolidWorks pack-and-go assembly of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter) V1.0. This model does not include all aspects of the design (i.e. RO (reverse osmosis) system, electrical enclosure, hose, cable) it o...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
MASK4 Test Campaign for Sandia WaveBot Device Dataset
This data and report details the findings from a wave tank test focused on production of useful work of a wave energy converter (WEC) device. The experimental system and test were specifically designed to validate models for power transmission throughout the WEC system. Additional...
Forbush, D. et al Sandia National Laboratories
Dec 25, 2023
5 Resources
0 Stars
Curated
5 Resources
0 Stars
Curated
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
The core objectives of this project is to improve the power capture of three different wave energy
conversion (WEC) devices by more than 50% using an advanced control system and validate the
attained improvements using wave tank and full scale testing. In parallel, we will bring a...
Previsic, M. et al Re Vision Consulting
Aug 26, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 Electrical PTO Deployment Data and Analysis
This submission includes the processed and raw field electrical data from NREL's August 2022 HERO WEC (hydraulic and electric reverse osmosis wave energy converter) deployment at Jennette's Pier for the electrical PTO (power take-off).
Nakhai, A. et al National Renewable Energy Laboratory
Aug 12, 2022
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Reference Model 3 Cost Breakdown (RM3: Wave Point Absorber)
Contains the Reference Model 3 (RM3) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM3 device and multiple unit arrays. These spreadsheets are contained within an XLSX file and a spreadsheet editor such as Mi...
Neary, V. et al Sandia National Laboratories
Sep 30, 2014
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Reference Model 3 Scaled Geometry (RM3: Wave Point Absorber)
Contains the Reference Model 3 (RM3) scaled scale geometry files of the Wave Point Absorber, developed by the Reference Model Project (RMP). These scaled geometry files are saved as SolidWorks assembly, IGS, and STEP files, and require a CAD program to view. The scaled RM3 device ...
Neary, V. et al Sandia National Laboratories
Sep 30, 2014
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible