Search MHK Data
Showing results 76 - 100 of 443.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Holistic Control Embedded PTO Development Target Performance Metrics Definitions
Collection of Power Take-Off (PTO), Power Conversion Chain (PCC), and relevant device metrics to be used for performance assessment of the Control co-designed PTO including brief summary of literature, baseline, and target metrics values.
Boerner, T. et al CalWave Power Technologies Inc.
Jul 30, 2019
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Modular RivGen LCOE Content Model
The Modular RivGen LCOE Content Model contains estimates of levelized cost of energy (LCOE) for three array configurations operating in a theoretical river environment. The LCOE is distinguished by the CapEx, OpEx, and annual energy production and capture for each river environment.
Tyler, R. and Obomsawin, T. Ocean Renewable Power Company
Dec 15, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Water Horse Hydroelectric Harvester Dual Oscillator Field Testing Data, UAF Nenana Alaska, 2021
Raw and processed timeseries data generated during field testing of a single "galloping oscillator" Water Horse prototype at PMEC (Pacific Marine Energy Center) Tanana River Test Site in Nenana, AK for 3 weeks in 2021. Data collection by University of Alaska, Fairbanks.
Loeffler, B. et al University of Alaska Fairbanks
Aug 18, 2021
1 Resources
0 Stars
In curation
1 Resources
0 Stars
In curation
TidGen: Turbine Production Report
The report below provides a comprehensive overview of the production process for the first TidGen turbine. The turbine is composed of several key components, including carbon fiber foils, e-glass struts, and a steel shaft. The report covers the production of each of these elements...
Barrington, M. Ocean Renewable Power Company
Jan 30, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Aquantis 2.5 MW Ocean Current Generation Device Full Scale Mooring Analysis Report and Specifications
This dataset contains the Aquantis 2.5 MW Ocean Current Generation Device full scale mooring analysis report and specifications.
Arthurs, D. Dehlsen Associates, LLC
Jun 03, 2015
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Final Technical Report
Final Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeling.
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
StingRAY System and LCOE Content Models
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LCOE Analysis of Surge-Mode WEC
Spreadsheet which provides estimates of reductions in Levelized Cost of Energy for a surge-mode wave energy converter (WEC). This is made available via adoption of the advanced control strategies developed during this research effort.
Staby, B. Resolute Marine Energy, Inc.
Mar 07, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System System Fabrication Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Control-based optimization for tethered tidal kite
This submission includes three peer-reviewed (under review) papers from the researchers at North Carolina State University presenting control-based techniques to maximize effectiveness of a tethered tidal kite. Below are the abstracts of each file included in the submission.
Cobb...
Vermillion, C. et al North Carolina State University
Mar 02, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
CalWave Revised IO&M Plan CalWave Open Water Demo
Revised IO&M Plan for CalWave's open water demonstration at Scripps Institution of Oceanography for the open water demonstration to be conducted in collaboration with University of California, San Diego (UCSD) near the Scripps Institute of Oceanography (SIO) pier, in a water dept...
Petcovic, D. et al CalWave Power Technologies Inc.
Jun 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Holistic PTO Design Product Requirement Document
CalWave Power Technologies is currently in the process of developing the conceptual architecture for a fully upscaled Wave Energy Converter. Current and past efforts have been for smaller scaled systems, with commensurately lower forces and length scales. This document contains a ...
Kojimoto, N. et al CalWave Power Technologies Inc.
Dec 06, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Deep Ocean Basin Test Plan, Ireland
Documentation of CalWave's wave tank test plan (including test setup and overview) at the Deep Ocean Basin at Ringaskiddy, Cork, Ireland. Experimental tank testing of scaled prototype units will be conducted repeatedly throughout the design process to verify device performance for...
Boerner, T. et al CalWave Power Technologies Inc.
Oct 31, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine System Performance Analysis
This document offers a detailed performance analysis of the Single Turbine System (STS) developed by ORPC in Cobscook Bay, Maine, in 2023. The report includes system descriptions, deployment, and planned instrumentation, alongside data collection strategies. The performance evalua...
McEntee, J. Ocean Renewable Power Company
Jan 11, 2024
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine System (STS) Deployment and Mooring Report
This document provides a summary for the performance of the deployment and mooring systems for a single turbine test system (STS) deployed by the Ocean Renewable Power Company (ORPC) in Cobscook Bay, Maine in 2023.
Pillsbury, L. Ocean Renewable Power Company
Jan 05, 2024
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Cook Inlet Tidal Survey at Hilcorp Platforms
Ebb and flood tidal measurements utilizing ADCP deployments on bottom moorings (upward looking orientation) in the vicinity of platform locations.
Raw AD2CP Nortek files: S100259A020_Dillon.ad2cp.zip, S104453A003_PlatformA.ad2cp.zip, S104599A001_Steelhead2.ad2cp.zip
Processed AD2...
DUVOY, P. and Loeffler, B. University of Alaska Fairbanks
Jan 28, 2025
7 Resources
0 Stars
In progress
7 Resources
0 Stars
In progress
Pacific Marine Energy Center, OR South Energy Test Site, Wave Measurements
TRIAXYS data from the NNMREC-SETS, for Nov. 2014 Jan. 2015, and May 2015 Dec. 2015. The data consists of: Date, Time, significant wave height (1 hour average), significant wave period (1 hour average).
Von, A. Northwest National Marine Renewable Energy Center
Jun 06, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Numerical Survivability Report Baseline Geometry
Summary of numerical survivability modeling method for the baseline geometry of the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX."
Roberts, J. et al M3 Wave
Aug 16, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LCOE Baseline for Wave Carpet WEC Device
This is an LCOE (levelized cost of energy) baseline assessment for the Wave Carpet.
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Material Set Selection
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TEAMER: Crossflow Turbine Fairing Geometry Optimization Report and CFD Modeling Files
The dataset includes computational fluid dynamics (CFD) models and simulation files for crossflow turbines as well as a detailed project report. The report documents the project undertaken by the Ocean Renewable Power Company (ORPC) to design and optimize a modular fairing for the...
McEntee, J. Ocean Renewable Power Company
Aug 08, 2024
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
RANS Simulation VBM of Single Lab Scaled DOE RM1 MHK Turbine
Attached are the .cas and .dat files for the Reynolds Averaged Navier-Stokes (RANS) simulation of a single lab-scaled DOE RM1 turbine implemented in ANSYS FLUENT CFD-package.
The lab-scaled DOE RM1 is a re-design geometry, based of the full scale DOE RM1 design, producing same po...
Javaherchi, T. et al University of Washington (NNMREC)
Apr 15, 2014
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
CalWave Open Water Demo FMEA Update Budget Period 2
The Failure Modes and Effects Analysis (FMEA) is a qualitative reliability technique for systematically analyzing each possible failure mode within a hardware system, and identifying the resulting effect on that system, the mission, and the personnel. This submission includes an u...
Boerner, T. et al CalWave Power Technologies Inc.
Oct 09, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Design for PacWave Preliminary Design Phase Risk Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan ...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
RITE Gen5 KHPS Performance Period B
Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over 16 days in May 2021 during Period B operation. Along with performance data, the data includes setup data, project metadata, and char...
Corren, D. et al Verdant Power Inc.
Dec 23, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release