Search MHK Data
Showing results 96 - 120 of 253.
Show
results per page.
Order by:
Availability:
Technologies
Topics
Featured Projects
Collection Method
Data Type
LCOE Analysis of Surge-Mode WEC
Spreadsheet which provides estimates of reductions in Levelized Cost of Energy for a surge-mode wave energy converter (WEC). This is made available via adoption of the advanced control strategies developed during this research effort.
Resolute Marine Energy, Inc.
Mar 07, 2017
1 Resources
Publicly accessible
1 Resources
Publicly accessible
StingRAY System and LCOE Content Models
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Columbia Power Technologies, Inc.
Mar 06, 2017
2 Resources
Awaiting release
2 Resources
Awaiting release
Holistic Control Embedded PTO Development Target Performance Metrics Definitions
Collection of Power Take-Off (PTO), Power Conversion Chain (PCC), and relevant device metrics to be used for performance assessment of the Control co-designed PTO including brief summary of literature, baseline, and target metrics values.
Boerner, T. et al CalWave Power Technologies Inc.
Jul 30, 2019
1 Resources
Awaiting release
1 Resources
Awaiting release
NWEI Azura November 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Northwest Energy Innovations
Dec 15, 2015
9 Resources
Awaiting release
9 Resources
Awaiting release
Triton-C WEC Fabrication Plan (DDP)
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement.
Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
Curated
1 Resources
Curated
BOBr Raw Breaking Wave Data, Agate Beach, OR
Raw data from the BOBr (Buoy to Observe Breaking) wave measurement buoy. Data was recorded off the coast of Newport, OR at Agate Beach, in the surf zone.
Oregon State University
Oct 31, 2013
12 Resources
Publicly accessible
12 Resources
Publicly accessible
Triton-C WEC Detailed System Design Package
The Detailed System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
D6 presents an overview of the final detailed design package for the T...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
5 Resources
Curated
5 Resources
Curated
StingRAY H1 Humboldt Cost Breakdown Structure
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure
Columbia Power Technologies, Inc.
Mar 06, 2017
1 Resources
Awaiting release
1 Resources
Awaiting release
Advanced Control Systems for Wave Energy Converters
This submission contains several papers, a final report, descriptions of a theoretical framework for two types of control systems, and descriptions of eight real-time flap load control policies with the objective of assessing the potential improvement of annual average capture eff...
Scruggs, J. et al Resolute Marine Energy, Inc.
Jan 30, 2017
4 Resources
Publicly accessible
4 Resources
Publicly accessible
ALFA Oscillating Water Column Device Testing
Data from Phase 1 testing of a single ALFA Oscillating Water Column (OWC) device at the O.H. Hinsdale Wave Research Laboratory (HWRL) at Oregon State University in Fall of 2016. Contains two zip files of raw data, one of project data, and a diagram of the device with dimensions. ...
Northwest National Marine Renewable Energy Center
Nov 07, 2016
4 Resources
Publicly accessible
4 Resources
Publicly accessible
MASK3 for Advanced WEC Dynamics and Controls
This report outlines the "MASK3" wave tank test within the Advanced WEC Dynamics and Controls (AWDC) project. This test represents the final test in the AWDC project. The focus of the MASK3 test was to consider coordinated 3-degree-of-freedom (3DOF) control of a WEC in a realistic...
Coe, R. et al Sandia National Laboratories
May 01, 2019
4 Resources
Publicly accessible
4 Resources
Publicly accessible
NWEI Azura May 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Jul 23, 2018
9 Resources
Awaiting release
9 Resources
Awaiting release
NWEI Azura June 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Jul 31, 2018
8 Resources
Awaiting release
8 Resources
Awaiting release
Early Market Opportunity MHK Energy Site Identification Wave and Tidal Resources
This data was compiled for the 'Early Market Opportunity Hot Spot Identification' project. The data and scripts included were used in the 'MHK Energy Site Identification and Ranking Methodology' Reports (see resources below). The Python scripts will generate a set of results--base...
National Renewable Energy Laboratory
Apr 01, 2016
7 Resources
Publicly accessible
7 Resources
Publicly accessible
Centipod WEC, Advanced Controls, WEC Geometry CAD
CAD files depicting the wetted geometry of the Centipod WEC used in numerical models during this project. This includes the wetted geometry of the point absorber body ('pod') and the WEC 'backbone'.
Dehlsen Associates, LLC
Feb 15, 2016
3 Resources
Awaiting release
3 Resources
Awaiting release
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
Curated
1 Resources
Curated
FOSWEC v2: system identification and control
This report describes the testing of a model scale wave energy converter. This device, which uses two ``flaps'' that pivot about a central platform when excited by waves, has a natural frequency within the range of the waves by which it is excited. The primary goal of this test wa...
Coe, R. et al Sandia National Laboratories
Feb 01, 2020
0 Resources
In progress
0 Resources
In progress
MOIS Installation on NWEI Azura Half Scale WEC WETS Testing Documentation
This submission includes documentation on the Modular Ocean Instrumentation System (MOIS) installation on the Azura 1/2 scale wave energy converter at the Marine Station Kaneohe Bay (MCBH). Data from the deployment will be uploaded over the course of the test. The instrumentatio...
National Renewable Energy Laboratory
May 30, 2015
7 Resources
Publicly accessible
7 Resources
Publicly accessible
Ocean Sentinel Mooring and Environmental Data 2013
Load cell data of Ocean Sentinel (OS) mooring, OS locations data and environmental conditions data (wave, wind, current) measured in the 2013 field test.
Oregon State University
Jul 29, 2013
6 Resources
Publicly accessible
6 Resources
Publicly accessible
Advanced WEC Dynamics and Controls, Test 1
Numerous studies have shown that advanced control of a wave energy converter's (WEC's) power take off (PTO) can provide significant increases (on the order of 200-300%) in WEC energy absorption. Transitioning these control approaches from simplified paper studies to application in...
Sandia National Laboratories
Feb 26, 2016
3 Resources
Publicly accessible
3 Resources
Publicly accessible
LCOE Content Model for the Heaving Point Absorber Buoy
This is the LCOE analysis spreadsheet and content model for the heaving point absorber buoy developed for controls purposes. The cost assessment was done on a wave-farm of 100-units.
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Jul 14, 2017
3 Resources
Awaiting release
3 Resources
Awaiting release
Triton: Survivability Enhancement of a Multi-Mode Point Absorber
The overall goal of this project was to design and validate a survival mode for the Triton WEC that allows for a reduction in peak loads, while simultaneously allowing for a reduction of capital cost due to the elimination of overdesign to account for uncertainty. In addition, the...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Sep 28, 2018
11 Resources
Awaiting release
11 Resources
Awaiting release
Performance estimation of resonance-enhanced dual-buoy wave energy converter using coupled time-domain simulation
This paper presents the modeling methodology and performance evaluation of the resonance-enhanced dual-buoy WEC (Wave Energy Converter) by HEM (hydrodynamic & electro-magnetic) fully-coupled-dynamics time-domain-simulation program. The numerical results are systematically compared...
Kang, H. et al Texas A&M University
Aug 31, 2020
1 Resources
In curation
1 Resources
In curation
Northwest National Marine Renewable Energy Center, OR Final Technical Report & Appendices
In 2008, the US Department of Energy (DOE) Wind and Water Power Program issued a funding opportunity announcement to establish university-led National Marine Renewable Energy Centers. Oregon State University and the University of Washington combined their capabilities in wave and ...
Northwest National Marine Renewable Energy Center
Jun 30, 2016
2 Resources
Publicly accessible
2 Resources
Publicly accessible
AquaHarmonics WEC 1:20 Scale Tank Test Data
Data from tank tests collected using AquaHarmonics 1:20 scale model that occurred in June and October 2018.
Hagmuller, A. AquaHarmonics
Oct 29, 2018
1 Resources
Publicly accessible
1 Resources
Publicly accessible