Wave Energy Prize 1/50th Testing Waveswing America Submerged Pressure Differential WEC
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Waveswing America team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
Results
Scharmen, W. Ricardo Detroit Technical Center
Jan 22, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
CalWave Device Behavior in Different Sea States from Scaled Tank Testing
This submission contains a summary of tank test derived WEC device behavior in different irregular sea states.
CalWave sought to conduct experimental tank testing of scaled prototype units early on in the design process to obtain a first estimation of device performance for sea ...
Boerner, T. and Murray, B. CalWave Power Technologies Inc.
Mar 30, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
RITE Gen5 KHPS Levelized Cost of Energy
Levelized Cost of Energy analysis for Verdant Power Gen5 KHPS utilizing annualized AEP based on actual energy generation at the RITE Project during 2020-21. The WEC devices analyzed include attenuator, point absorber, oscillating wave surge converter, oscillating water column, ove...
Corren, D. et al Verdant Power Inc.
Jun 22, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
HERO WEC V1.0 WEC-Sim Detailed Simulation Runs and Summary Data
Data sets from simulation runs include 144 wave cases that were run based on the WEC-Sim model (https://mhkdr.openei.org/submissions/483). The 144 wave cases represent waves with the following wave height and wave period ranges:
Significant Wave Height: 0.25 4.0m in 0.25m incre...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 Electrical PTO Deployment Data and Analysis
This submission includes the processed and raw field electrical data from NREL's August 2022 HERO WEC (hydraulic and electric reverse osmosis wave energy converter) deployment at Jennette's Pier for the electrical PTO (power take-off).
Nakhai, A. et al National Renewable Energy Laboratory
Aug 12, 2022
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Triton-C WEC Fabrication Plan (DDP)
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement.
Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced WEC Dynamics and Controls, Test 1
Numerous studies have shown that advanced control of a wave energy converter's (WEC's) power take off (PTO) can provide significant increases (on the order of 200-300%) in WEC energy absorption. Transitioning these control approaches from simplified paper studies to application in...