M3 Wave DMP/APEX WEC Projected LCOE
Projected LCOE model for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," based on information gained during project performance.
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 01, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
StingRAY System and LCOE Content Models
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Techno-Economic Optimization of the SurgeWEC Device
This is the post-access report for a Teamer-funded effort to optimize the SurgeWEC device, a near-shore pivoting flap wave energy conversion device used to desalinate water. Parametrically driven cost and performance models enabled an integrated optimization approach at the farm s...
Previsic, M. Re Vision Consulting
Feb 20, 2022
2 Resources
0 Stars
In curation
2 Resources
0 Stars
In curation
LCOE Baseline for OE Buoy WEC Device
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the Ocean Energy ...
Previsic, M. et al Re Vision Consulting
Jul 26, 2017