Techno-Economic Optimization of the SurgeWEC Device
This is the post-access report for a Teamer-funded effort to optimize the SurgeWEC device, a near-shore pivoting flap wave energy conversion device used to desalinate water. Parametrically driven cost and performance models enabled an integrated optimization approach at the farm s...
Previsic, M. Re Vision Consulting
Feb 20, 2022
2 Resources
0 Stars
In curation
2 Resources
0 Stars
In curation
Advanced TidGen Power System Preliminary IO&M and Testing Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Verdant Power Gen5 KHPS and TriFrame System Content Models
This submission includes the Component Content Model for Verdant Power TriFrame and the System Content Model for Verdant Power TriFrame + 3 Gen5 KHPS Turbines. The TriFrame is the foundation component of the system, which consists of a TriFrame + 3 Gen5 KHPS Turbines (TF+3T).
Corren, D. et al Verdant Power Inc.
Jul 05, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
WEC Controls Optimization Final Report
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be cons...
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Aug 26, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
MHK Levelized Cost of Energy (LCOE) Guidance and Techo Economic Analysis Materials
Useful information and tools for calculating the Levelized Cost of Energy (LCOE) and MHK Cost Breakdown Structure. Includes a structure for calculating the capital expenditures and operating costs of a marine energy technology or device, reference resource data for both wave and ...
Jenne, S. and Baca, E. National Renewable Energy Laboratory
Nov 08, 2019
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
LCOE Baseline for OE Buoy WEC Device
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the Ocean Energy ...
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources