Search MHK Data
Showing results 1 - 11 of 11.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Simulink Model of a New Energy EVG-005 5kW Hydropower Turbine
Simulink model for a New Energy 5kW hydropower turbine.
ADCP data ("ds_streamwise_7_13.nc") and DC voltage, DC current, and rotor rotation observed from the New Energy EVG-005 Current Energy Converter (CEC) ("electrical_7_13_10ohms.nc") were collected at the Tanana River Test Sit...
Browning, E. et al University of Alaska Fairbanks
Jul 13, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 WEC-Sim Model (July 2024)
**This submission supersedes submission MHKDR-483**
This submission file contains the files that are needed to simulate NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter). This requires the user to have already installed WEC-Sim. In addition to the sta...
Panzarella, J. et al National Renewable Energy Laboratory
Jul 01, 2024
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
RivGen Deployment Control System Specifications and Models, Igiugig, AK
Control System simulation models, case studies, and processing codes for analyzing field data. Raw data files included from VFD and SCADA.
MatLab and Simulink are required to open some data files and all model files.
Forbush, D. et al Ocean Renewable Power Company
Mar 21, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
MASK3 for Advanced WEC Dynamics and Controls
This report outlines the "MASK3" wave tank test within the Advanced WEC Dynamics and Controls (AWDC) project. This test represents the final test in the AWDC project. The focus of the MASK3 test was to consider coordinated 3-degree-of-freedom (3DOF) control of a WEC in a realistic...
Coe, R. et al Sandia National Laboratories
May 01, 2019
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 WEC-Sim Model
This zip file contains the files that are needed to simulate NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter). This requires the user to have already installed WEC-Sim. In addition to the standard toolboxes that are required to run WEC-Sim the user wi...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Optimization of Marine Energy Conversion Systems Through Modeling, Optimization, and CHIL Validation
The work aims to achieve optimal tidal energy conversion through a comprehensive approach of modeling, optimization, and control hardware-in-the-loop (CHIL) validation. By developing accurate models and employing optimization techniques, it seeks to identify efficient system confi...
Luo, F. et al Stony Brook University
Jul 17, 2023
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
TEAMER: AquaHarmonics High Fidelity WEC Sim PTO and Control Model Validation, Sim Model
Collaborative effort between AquaHarmonics, Sandia National Laboratories (SNL), and the National Renewable Energy Laboratory (NREL) to revise and validate Aquaharmonics' full wave to wire model, allowing for reduced uncertainty and increased understanding of design requirements of...
Tom, N. and Leon, J. AquaHarmonics, Inc.
Dec 31, 2021
6 Resources
0 Stars
Curated
6 Resources
0 Stars
Curated
TEAMER AquaHarmonics High Fidelity WEC Sim PTO and Control Model Validation, Test Logs and Results
Collaborative effort between AquaHarmonics, Sandia National Laboratories (SNL), and the National Renewable Energy Laboratory (NREL) to revise and validate Aquaharmonics' full wave to wire model, allowing for reduced uncertainty and increased understanding of design requirements of...
Hagmuller, A. et al AquaHarmonics, Inc.
Dec 16, 2021
9 Resources
0 Stars
Curated
9 Resources
0 Stars
Curated
ALFA Oscillating Water Column Device Testing
Data from Phase 1 testing of a single ALFA Oscillating Water Column (OWC) device at the O.H. Hinsdale Wave Research Laboratory (HWRL) at Oregon State University in Fall of 2016. Contains two zip files of raw data, one of project data, and a diagram of the device with dimensions. ...
Bosma, B. Northwest National Marine Renewable Energy Center
Nov 07, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
TEAMER: Numerical Modeling and Optimization of the iProTech Pitching Inertial Pump (PIP) Wave Energy Converter (WEC)
This project focused on developing an automated workflow to evaluate and optimize the iProTech Pitching Inertial Pump (PIP) wave energy converter (WEC) using open-source Python packages and the MATLAB/Simulink tool, WEC-Sim. The process involved parameterizing key design variables...
Wynn, N. et al National Renewable Energy Laboratory
Apr 11, 2024
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
The core objectives of this project is to improve the power capture of three different wave energy
conversion (WEC) devices by more than 50% using an advanced control system and validate the
attained improvements using wave tank and full scale testing. In parallel, we will bring a...
Previsic, M. et al Re Vision Consulting
Aug 26, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible