HydroAir Power Take Off Combined Design Report
The submission is the combined design report for the HydroAir Power Take Off (PTO). CAD drawings, circuit diagrams, design report, test plan, technical specifications and data sheets are included for the Main and auxiliary control cabinets and three-phase-synchronous-motor with a ...
Pearson, G. et al Dresser-Rand Company
Jun 26, 2015
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
TEAMER: Wave Energy Converter SIMulator (WEC-SIM) Support for an Adaptive Wave Energy Converter by Ocean Motion Technologies
Scripts from project git repo + tutorial slide deck generated for the TEAMER RFTS 1 (request for technical support) collaborative project between Ocean Motion Technologies, Inc. and Sandia National Laboratories + National Renewable Energy Laboratory. The project simulates an adapt...
Keester, A. et al Ocean Motion Technologies, Inc.
Jan 29, 2021
3 Resources
0 Stars
Awaiting release
3 Resources
0 Stars
Awaiting release
CalWave WEC Open Water Demonstration Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
1 Stars
Curated
2 Resources
1 Stars
Curated
Laminar Scientific TEAMER RFTS9
Post access report and GitHub repository reflecting the work done under the TEAMER RFTS9 award.
Iyer, N. et al Laminar Scientific Inc.
Nov 21, 2024
3 Resources
0 Stars
Awaiting curation
3 Resources
0 Stars
Awaiting curation
CalWave WEC Open Water Demonstration Public Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
Triton-C WEC Fabrication Plan (DDP)
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement.
Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors
The lifetime assessment experimental platform described in this report is specifically designed for testing the low-speed main shaft seal for Verdant Power's (Verdant Power Inc., New York, New York) fifth-generation (Gen5) underwater power generation turbine. This project is joint...
Murray, R. et al National Renewable Energy Laboratory
Jul 01, 2024
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated
CalWave Design For PacWave Preliminary Design Phase Project Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. For the Preliminary Design Phase, the Project Management Plan outlines the project objectives, broader impacts, project tasks and timeline, c...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Holistic Control Embedded PTO Development Target Performance Metrics Definitions
Collection of Power Take-Off (PTO), Power Conversion Chain (PCC), and relevant device metrics to be used for performance assessment of the Control co-designed PTO including brief summary of literature, baseline, and target metrics values.
Boerner, T. et al CalWave Power Technologies Inc.
Jul 30, 2019
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced Control Systems for Wave Energy Converters
This submission contains several papers, a final report, descriptions of a theoretical framework for two types of control systems, and descriptions of eight real-time flap load control policies with the objective of assessing the potential improvement of annual average capture eff...
Scruggs, J. et al Resolute Marine Energy, Inc.
Jan 30, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
CalWave Revised IO&M Plan CalWave Open Water Demo
Revised IO&M Plan for CalWave's open water demonstration at Scripps Institution of Oceanography for the open water demonstration to be conducted in collaboration with University of California, San Diego (UCSD) near the Scripps Institute of Oceanography (SIO) pier, in a water dept...
Petcovic, D. et al CalWave Power Technologies Inc.
Jun 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Holistic PTO Design Product Requirement Document
CalWave Power Technologies is currently in the process of developing the conceptual architecture for a fully upscaled Wave Energy Converter. Current and past efforts have been for smaller scaled systems, with commensurately lower forces and length scales. This document contains a ...
Kojimoto, N. et al CalWave Power Technologies Inc.
Dec 06, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Deep Ocean Basin Test Plan, Ireland
Documentation of CalWave's wave tank test plan (including test setup and overview) at the Deep Ocean Basin at Ringaskiddy, Cork, Ireland. Experimental tank testing of scaled prototype units will be conducted repeatedly throughout the design process to verify device performance for...
Boerner, T. et al CalWave Power Technologies Inc.
Oct 31, 2022
1 Resources
0 Stars
Curated
1 Resources
0 Stars
Curated
CalWave Design for PacWave Preliminary Design Phase Risk Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan ...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
Specified System Requirements for the HydroAir Power Take Off System
Includes Annual Energy Production of the system, Target Availability of the system, the system's PWR (power to weight ratio), Critical Dimensions and Weights (e.g. center of gravity and center of buoyancy, capture length) of the system, the system's Noise Levels, and All Grid Requ...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Design Specifications for Manufacturer for the HydroAir Power Take Off System
Includes Design Specs for Manufacturer, PTO Weight, PTO Dimensions, Turbine (Rotor and Ductwork) Design, CAD Drawings of the turbine and rotor, List of components and weights, Materials Used, Generator, List of components and weights, Structural Design, CAD drawings of the structu...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Single Turbine Test Procedure and Data Acquisition Plan
This document describes the test procedure and the data acquisition plan for the Single Turbine Subsystem (STS) testing that is part of the Advanced TidGen Power System. The goal of the Advanced TidGen Power System is to demonstrate a commercially viable tidal power system, integr...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Tank Testing Lir Deep Ocean Basin
Experimental tank testing report for CalWave's 1:20 & 1:30 scale prototype testing at the Lir National Ocean Test Facility in Ireland. Testing was completed in January 2018. Test report includes description of the scaled prototype, primary testing objectives, instrumentation and b...
Boerner, T. CalWave Power Technologies Inc.
Jan 15, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System
Includes Maximum Cost, Critical Dimensions and Weights, Damping Curve, Rotor Speed Profile Changes, Mechanical Power for a given pressure and airflow, Turbine rpm range and power, Generator input torque, Torque speed curves/profile, Generated electrical power for given input torqu...
Natanzi, S. and Hall, R. Siemens Government Technologies, Inc.
Oct 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave First Iterative PTO Description
This documents summarizes a preliminary first iterative design of a PTO device developed by CalWave. The document includes controls, hydraulic, and electric architectures from the first iteration of the CalWave PTO design that match requirements set out by the "CalWave Holistic PT...
Kojimoto, N. et al CalWave Power Technologies Inc.
Dec 06, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
Triton-C Point Absorber Preliminary System Design Package
Preliminary System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
Mundon, T. Oscilla Power, Inc.
Dec 01, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Single Turbine Test Procedure and Data Acquisition Plan, Rev. B
The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80. This document describes the te...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave xWave Device, Non-Commercially Sensitive Project Report
CalWave has developed a submerged pressure differential type Wave Energy Converter (WEC) architecture called xWave. The single body device oscillates submerged, is positively buoyant, and taut moored to the sea floor and integrates novel features such as absorber submergence depth...
Lehmann, M. and Davidson, R. CalWave Power Technologies Inc.
Feb 29, 2024
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Direct-Drive Electrical Generator and PTO System for Flap-type Wave Energy Converters
Project and generator specifications and initial prototype test data for flap-type wave energy converters (WEC)
Englebretson, S. ABB Inc.
Mar 20, 2015
2 Resources