Search MHK Data
Showing results 226 - 250 of 457.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
TidGen: Single Turbine System (STS) Deployment and Mooring Report
This document provides a summary for the performance of the deployment and mooring systems for a single turbine test system (STS) deployed by the Ocean Renewable Power Company (ORPC) in Cobscook Bay, Maine in 2023.
Pillsbury, L. Ocean Renewable Power Company
Jan 05, 2024
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
M3 Wave DMP/APEX WEC Numerical Survivability Report Baseline Geometry
Summary of numerical survivability modeling method for the baseline geometry of the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX."
Roberts, J. et al M3 Wave
Aug 16, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LCOE Baseline for Wave Carpet WEC Device
This is an LCOE (levelized cost of energy) baseline assessment for the Wave Carpet.
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
USWAN Model Hindcast East Coast Regional Model (ECoRM)
Summary tables and plots of six International Electrotechnical Commission (IEC) wave parameters, including time series, scatter plots, and tables summarizing model performance.
Neary, V. Sandia National Laboratories
Sep 29, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Material Set Selection
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
RANS Simulation VBM of Single Lab Scaled DOE RM1 MHK Turbine
Attached are the .cas and .dat files for the Reynolds Averaged Navier-Stokes (RANS) simulation of a single lab-scaled DOE RM1 turbine implemented in ANSYS FLUENT CFD-package.
The lab-scaled DOE RM1 is a re-design geometry, based of the full scale DOE RM1 design, producing same po...
Javaherchi, T. et al University of Washington (NNMREC)
Apr 15, 2014
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Techno-Economic Assessment of the Crestwing WEC Device
This is the final report from a Teamer-funded effort to perform a techno-economic assessment of the Crestwing WEC device.
Background: Crestwing (www.crestwing.dk) is a wave energy converter (WEC) of the attenuator type consisting of two large rectangular barges hinged together a...
Previsic, M. Re Vision Consulting
Mar 14, 2025
2 Resources
0 Stars
Awaiting curation
2 Resources
0 Stars
Awaiting curation
CalWave Open Water Demo FMEA Update Budget Period 2
The Failure Modes and Effects Analysis (FMEA) is a qualitative reliability technique for systematically analyzing each possible failure mode within a hardware system, and identifying the resulting effect on that system, the mission, and the personnel. This submission includes an u...
Boerner, T. et al CalWave Power Technologies Inc.
Oct 09, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Design for PacWave Preliminary Design Phase Risk Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan ...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
RITE Gen5 KHPS Performance Period B
Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over 16 days in May 2021 during Period B operation. Along with performance data, the data includes setup data, project metadata, and char...
Corren, D. et al Verdant Power Inc.
Dec 23, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
HERO WEC V1.0 SolidWorks Model
The attached zip file includes a SolidWorks pack-and-go assembly of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter) V1.0. This model does not include all aspects of the design (i.e. RO (reverse osmosis) system, electrical enclosure, hose, cable) it o...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Wave tank testing data, Stevens Institute of Technology, Hoboken
E-Wave Technologies LLC conducted wave tank testing at Stevens Institute of Technology 11/28/2022-12/6/2022 and 8/9/2023-8/18/2023. The measured testing data, including force, displacement, and voltage are uploaded.
Lou, J. and Bennett, A. E-Wave Technologies LLC
Aug 18, 2023
2 Resources
0 Stars
In curation
2 Resources
0 Stars
In curation
LCOE and Baseline Data for ORPC's RivGen 1.F River Power System
Base data and documentation of LCOE calculations for ORPC's RivGen 1.F Power System, demonstrated in the Kvichak River at Igiugig, Alaska in 2015.
Salmon, A. Igiugig Village Council
Oct 31, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
StingRAY H1 Humboldt Cost Breakdown Structure
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure
Rhinefrank, K. Columbia Power Technologies, Inc.
Mar 06, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC 1:50 Small Scale Tank Testing Plan
Detailed laboratory test plan for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Includes test points, materials and methods, and sensors/telemetry to be used. Includes schematics of test apparatus and sensor type and locations.
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 17, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
ORPC RivGen 2.0 at Igiugig, AK Operational Data 2019 and 2020
Information enclosed includes operational data from the ORPC RivGen 2.0 deployed at Igiugig, AK in 2019 and 2020. Flow velocities and device performance metrics are recorded along with a report detailing flow speed characterization where Igiugig river flow data is aggregated into ...
Tyler, R. ORPC Inc.
Apr 01, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine Subsystem (STS) Device Installation, Deployment, Retrieval, and Removal Procedures
This document provides the process details for installation of the Single Turbine Subsystem (STS) device from the assembly laydown location to the deployed location in Eastport, ME. These procedures will be conducted not only during initial deployment, but also during maintenance ...
Martin, T. Ocean Renewable Power Company
Feb 20, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced TidGen Power System 2.0 Presentation of System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Development Test Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Downselected System Overviews
In 2014, open water testing revealed that sediment scour around and under the device was significant and likely interrupted operations. To explore methods to mitigate this phenomenon, M3 developed a number of alternate concepts as detailed in concept sketches. This submission incl...
Morrow, M. and Delos-Reyes, M. M3 Wave
Sep 29, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
SNL-Delft3D-FM Validation and Case Study: CEC Array at Tanana River Test Site
These dataset support the validation and case study efforts for the SNL-Delft3D-FM program:
1) Set 1: Simulations of a single turbine in a flume under conditions conducted by Mycek (2014) with and with turbulent parameter correction. These simulations also include cases using var...
Sandia National Laboratories
Mar 19, 2025
0 Resources
0 Stars
In progress
0 Resources
0 Stars
In progress
Triton: Survivability Enhancement of a Multi-Mode Point Absorber
The overall goal of this project was to design and validate a survival mode for the Triton WEC that allows for a reduction in peak loads, while simultaneously allowing for a reduction of capital cost due to the elimination of overdesign to account for uncertainty. In addition, the...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Sep 28, 2018
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
Reference Model 1 Cost Breakdown (RM1: Tidal Current Turbine)
Contains the Reference Model 1 (RM1) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM1 device and multiple unit arrays. These spreadsheets are contained within an XLSX file and a spreadsheet editor such as Mi...
Neary, V. et al Sandia National Laboratories
Sep 30, 2014
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Material Characterization Program
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Deployment and Mooring System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible