Direct-Drive Electrical Generator and PTO System for Flap-type Wave Energy Converters
Project and generator specifications and initial prototype test data for flap-type wave energy converters (WEC)
ABB Inc. (2015)
Mar 20, 2015
2 Resources
2 Resources
M3 Wave DMP/APEX WEC Downselected System Overviews
In 2014, open water testing revealed that sediment scour around and under the device was significant and likely interrupted operations. To explore methods to mitigate this phenomenon, M3 developed a number of alternate concepts as detailed in concept sketches. This submission incl...
Morrow, M. and Delos-Reyes, M. M3 Wave (2017)
Sep 29, 2017
1 Resources
1 Resources
StingRAY H1 Humboldt Cost Breakdown Structure
Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure
Columbia Power Technologies, Inc. (2017)
Mar 06, 2017
1 Resources
1 Resources
M3 Wave DMP/APEX WEC Numerical Survivability Report - Baseline Geometry
Summary of numerical survivability modeling method for the baseline APEX geometry.
Roberts, J. et al M3 Wave (2016)
Aug 16, 2016
2 Resources
2 Resources
M3 Wave DMP/APEX WEC Projected LCOE
Projected LCOE model based on information gained during project performance.
Morrow, M. and Delos-Reyes, M. M3 Wave (2018)
Aug 01, 2018
1 Resources
1 Resources
Azura Advanced Controls 1/15th Scale Wave Tank Testing
Experimental data from the wave tank test of the Advanced control systems developed by NWEI for the Azura. Summary data is included utilizing the WEC Lab Testing Content Model v2.1. All raw and processed experimental data files are also included. The test plan and test report are ...
Ling, B. Northwest Energy Innovations (2018)
Feb 02, 2018
10 Resources
10 Resources
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc. (2016)
Jun 13, 2016
3 Resources
3 Resources
Wave Tank Testing of 1-DoF Heaving Buoy for Controls Validation Purposes
This submission includes the wave tank testing data used to validate the controls optimization efforts of a heaving 1-DoF buoy.
Previsic, M. et al Re Vision Consulting (2017)
Jul 13, 2017
4 Resources
4 Resources
NWEI Azura June 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations (2018)
Jul 31, 2018
8 Resources
8 Resources
StingRAY System and LCOE Content Models
DOE System and LCOE (levelized costs of energy) Content Models completed for a utility-scale Stingray WEC.
Columbia Power Technologies, Inc. (2017)
Mar 06, 2017
2 Resources
2 Resources