Search MHK Data
Showing results 1 - 5 of 5.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
SeaRAY Open-Water Test Sensor MODAQ Data
This dataset contains raw sensor data collected during open-water testing of the SeaRAY wave energy converter system. Data were recorded using the MODAQ (Modular Ocean Data Acquisition) system and are provided in National Instruments TDMS format. A companion spreadsheet lists the ...
Hammagren, E. Columbia Power Technologies, Inc.
Nov 29, 2023
2 Resources
0 Stars
Curated
2 Resources
0 Stars
Curated
Triton-C WEC Fabrication Plan (DDP)
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement.
Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
SeaRAY Open-Water Test Sensor MODAQ Data II
This dataset contains raw sensor data collected during open-water testing of the SeaRAY wave energy converter system. Data were recorded using the MODAQ (Modular Ocean Data Acquisition) system and are provided in National Instruments TDMS format. A companion spreadsheet lists the ...
Zhang, Z. Columbia Power Technologies, Inc.
May 07, 2025
3 Resources
0 Stars
In curation
3 Resources
0 Stars
In curation
CalWave WEC Holistic PTO Design
This project aims to advance the Technology Readiness Level (TRL) of CalWave’s commercial scale Power Take-Off (PTO) subsystem through further increasing the level of coupling in physical PTO and concurrent controls design. This is achieved by incorporating a systematic holistic...
Boerner, T. et al CalWave Power Technologies Inc.
Sep 02, 2022
5 Resources
0 Stars
Awaiting release
5 Resources
0 Stars
Awaiting release