Search MHK Data
Showing results 1 - 4 of 4.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
H3 StingRAY Final Design and Technical Report Section 13 Appendices
These documents are referenced in the public version of the H3 StingRAY Final Design and Technical Report (Linked Dataset can be found in Resources section, below), and are submitted separately to allow for public release of head document. The display names have the corresponding ...
Lenee-Bluhm, P. and Prudell, J. Columbia Power Technologies, Inc.
Sep 15, 2023
53 Resources
0 Stars
Awaiting release
53 Resources
0 Stars
Awaiting release
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
StingRAY Updated WEC Risk Registers
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. and Ondusko, M. Columbia Power Technologies, Inc.
Jun 27, 2018
17 Resources
0 Stars
Publicly accessible
17 Resources
0 Stars
Publicly accessible
StingRAY Failure Mode, Effects and Criticality Analysis: WEC Risk Registers
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficient...
Rhinefrank, K. Columbia Power Technologies, Inc.
Jul 25, 2016
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible