Search MHK Data
Showing results 1 - 7 of 7.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
CalWave Design for PacWave Preliminary Design Phase Risk Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan ...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
Triton: Survivability Enhancement of a Multi-Mode Point Absorber
The overall goal of this project was to design and validate a survival mode for the Triton WEC that allows for a reduction in peak loads, while simultaneously allowing for a reduction of capital cost due to the elimination of overdesign to account for uncertainty. In addition, the...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Sep 28, 2018
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Control and SCADA System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
PacWave South SeaRAY k2 Risk Registers
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Sep 29, 2023
12 Resources
0 Stars
Awaiting release
12 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Deployment and Mooring System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Bench Testing Data and Report for an Early Prototype Pitch Resonator WEC
This dataset encompasses data and documentation from bench tests conducted on an early prototype of a "pitch resonator" wave energy converter (WEC). The testing aimed to validate numerical models and reduce risks associated with the pitch resonator concept, which is designed to co...
Coe, R. et al Sandia National Laboratories
Aug 09, 2024
4 Resources
0 Stars
Curated
4 Resources
0 Stars
Curated
H3 StingRAY Final Design and Technical Report Section 13 Appendices
These documents are referenced in the public version of the H3 StingRAY Final Design and Technical Report (Linked Dataset can be found in Resources section, below), and are submitted separately to allow for public release of head document. The display names have the corresponding ...
Lenee-Bluhm, P. and Prudell, J. Columbia Power Technologies, Inc.
Sep 15, 2023
53 Resources
0 Stars
Awaiting release
53 Resources
0 Stars
Awaiting release