CalWave Open Water Demo - Budget Period 1 Reports
The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment while continuing to exceed DOE's target ACE threshold of 3m/M$. The outcomes of Budget Period 1 will be a detailed design of the scaled demonstration unit and bench testing of the critical hardware components.
Citation Formats
CalWave Power Technologies Inc.. (2019). CalWave Open Water Demo - Budget Period 1 Reports [data set]. Retrieved from https://dx.doi.org/10.15473/1527029.
Boerner, Thomas, Kojimoto, Nigel, Murray, Bryan, and Petcovic, Dan. CalWave Open Water Demo - Budget Period 1 Reports. United States: N.p., 03 Jun, 2019. Web. doi: 10.15473/1527029.
Boerner, Thomas, Kojimoto, Nigel, Murray, Bryan, & Petcovic, Dan. CalWave Open Water Demo - Budget Period 1 Reports. United States. https://dx.doi.org/10.15473/1527029
Boerner, Thomas, Kojimoto, Nigel, Murray, Bryan, and Petcovic, Dan. 2019. "CalWave Open Water Demo - Budget Period 1 Reports". United States. https://dx.doi.org/10.15473/1527029. https://mhkdr.openei.org/submissions/311.
@div{oedi_311, title = {CalWave Open Water Demo - Budget Period 1 Reports}, author = {Boerner, Thomas, Kojimoto, Nigel, Murray, Bryan, and Petcovic, Dan.}, abstractNote = {The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment while continuing to exceed DOE's target ACE threshold of 3m/M$. The outcomes of Budget Period 1 will be a detailed design of the scaled demonstration unit and bench testing of the critical hardware components.}, doi = {10.15473/1527029}, url = {https://mhkdr.openei.org/submissions/311}, journal = {}, number = , volume = , place = {United States}, year = {2019}, month = {06}}
https://dx.doi.org/10.15473/1527029
Details
Data from Jun 3, 2019
Last updated Jun 4, 2024
Submitted Jun 4, 2019
Organization
CalWave Power Technologies Inc.
Contact
Marcus Lehmann
510.508.9897
Authors
Keywords
MHK, Marine, Hydrokinetic, energy, power, wave, water, technology, ocean, economics, tidal, lab test, project, scaled demo, DOE, simulation, open water demo, numerical simulations, WEC, Marine and Hydrokinetic Technology Development and Advancement, Technology Readiness Level, CalWave, scaled open water, deployment, PTO, Power take-off, MBL, Minimum Breaking Load, MPC, Model Predictive Control, Design Drawings, absorber, submerged pressure differential, pressure differential, open waterDOE Project Details
Project Name CWPT Open Water Demonstration
Project Lead Yana Shininger
Project Number EE0008097