Search MHK Data
Showing results 151 - 175 of 241.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Admiralty Inlet, WA Tidal Currents
Acoustic Doppler Current Profiler (ADCP) data from seafloor tripods in Admiralty Inlet, Puget Sound, Washington. Data collected from April 2009 through December 2012.
When using the data, please cite the J. Oceanic Eng. paper included in this submission, and please contact Jim Tho...
Thomson, J. Northwest National Marine Renewable Energy Center
Apr 01, 2009
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
TidGen: Single Turbine Subsystem (STS) Device Installation, Deployment, Retrieval, and Removal Procedures
This document provides the process details for installation of the Single Turbine Subsystem (STS) device from the assembly laydown location to the deployed location in Eastport, ME. These procedures will be conducted not only during initial deployment, but also during maintenance ...
Martin, T. Ocean Renewable Power Company
Feb 20, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
M3 Wave DMP/APEX WEC Downselected System Overviews
In 2014, open water testing revealed that sediment scour around and under the device was significant and likely interrupted operations. To explore methods to mitigate this phenomenon, M3 developed a number of alternate concepts as detailed in concept sketches. This submission incl...
Morrow, M. and Delos-Reyes, M. M3 Wave
Sep 29, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave Design for PacWave Preliminary Design Phase Risk Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan ...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
LCOE and Baseline Data for ORPC's RivGen 1.F River Power System
Base data and documentation of LCOE calculations for ORPC's RivGen 1.F Power System, demonstrated in the Kvichak River at Igiugig, Alaska in 2015.
Salmon, A. Igiugig Village Council
Oct 31, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Single Turbine Test Procedure and Data Acquisition Plan
This document describes the test procedure and the data acquisition plan for the Single Turbine Subsystem (STS) testing that is part of the Advanced TidGen Power System. The goal of the Advanced TidGen Power System is to demonstrate a commercially viable tidal power system, integr...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine Test Procedure and Data Acquisition Plan
The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. In...
Hayes, N. Ocean Renewable Power Company
Jun 03, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Preliminary Turbine Hydrodynamic Design
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
RANS Simulation ADM of the NREL Phase VI wind turbine modeled as MHK Turbine
Attached are the .cas and .dat files for the Reynolds Averaged Navier-Stokes (RANS) simulation of a single lab-scaled DOE RM1 turbine implemented in ANSYS FLUENT CFD-package.
In this case study the flow field around and in the wake of the NREL Phase VI wind turbine, modeled is MH...
Javaherchi, T. University of Washington
Jun 08, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Holistic Control Embedded PTO Development Target Performance Metrics Definitions
Collection of Power Take-Off (PTO), Power Conversion Chain (PCC), and relevant device metrics to be used for performance assessment of the Control co-designed PTO including brief summary of literature, baseline, and target metrics values.
Boerner, T. et al CalWave Power Technologies Inc.
Jul 30, 2019
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Final Technical Report
Final Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeling.
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Development Test Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
CalWave Tank Testing Lir Deep Ocean Basin
Experimental tank testing report for CalWave's 1:20 & 1:30 scale prototype testing at the Lir National Ocean Test Facility in Ireland. Testing was completed in January 2018. Test report includes description of the scaled prototype, primary testing objectives, instrumentation and b...
Boerner, T. CalWave Power Technologies Inc.
Jan 15, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Next Generation RivGen Power System: Feasibility Assessment of Hydroacoutics Data for Development of a Probability of Encounter Model of Salmon Smolts
This document contains a feasibility assessment for salmon smolt characterization and analysis based on existing hydroacoustics data and probability of encounter model.
Daroux, A. and Zydlewski, G. Igiugig Village Council
Oct 04, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System 2.0 Final BP1 Turbine Design Technical Report
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Final System Design Technical Report
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Co-Design of Marine Energy Converters for Autonomous Underwater Vehicle Docking and Recharging
The data presented is for the fixed and floating configurations of Halona WEC tested in regular and irregular waves. The results include differential pressure data, WEC motion, mooring line tension, and surface elevation. The findings of these results are presented in Ulm, Huang, ...
Ulm, N. et al University of Hawaii at Manoa
Mar 01, 2021
44 Resources
0 Stars
In curation
44 Resources
0 Stars
In curation
Advanced TidGen Power System Control and SCADA System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Triton: Survivability Enhancement of a Multi-Mode Point Absorber
The overall goal of this project was to design and validate a survival mode for the Triton WEC that allows for a reduction in peak loads, while simultaneously allowing for a reduction of capital cost due to the elimination of overdesign to account for uncertainty. In addition, the...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Sep 28, 2018
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
Single Turbine Test Procedure and Data Acquisition Plan, Rev. B
The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80. This document describes the te...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
MASK2B Initial Results from Wave Tank Test of Closed-Loop WEC Control
This dataset covers the MASK2B wave tank experiment focused on a more complete study of one degree of freedom (1DOF) control of the WEC was considered, including maximization of electrical power, multi-objective performance mapping, and implementation of a novel predictionless con...
Coe, R. et al Sandia National Laboratories
May 25, 2018
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
TidGen: Permits for Installation of Single Turbine Test System, Cobscook Bay, Maine
This is a summary of permits required and obtained for installation, operation, removal of the TidGen Single Turbine Test system in Cobscook Bay, May in 2023. The Ocean Renewable Power Company (ORPC) worked with federal and state entities to gain required permits and approvals tha...
Sellers-Reynolds, K. Ocean Renewable Power Company
Feb 27, 2024
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Quarterly Technical Report
Quarterly Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeli...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
CalWave xWave Device, Non-Commercially Sensitive Project Report
CalWave has developed a submerged pressure differential type Wave Energy Converter (WEC) architecture called xWave. The single body device oscillates submerged, is positively buoyant, and taut moored to the sea floor and integrates novel features such as absorber submergence depth...
Lehmann, M. and Davidson, R. CalWave Power Technologies Inc.
Feb 29, 2024
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible