Search MHK Data
Showing results 51 - 75 of 204.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
MOIS Installation on NWEI Azura Half Scale WEC WETS Testing Documentation
This submission includes documentation on the Modular Ocean Instrumentation System (MOIS) installation on the Azura 1/2 scale wave energy converter at the Marine Station Kaneohe Bay (MCBH). Data from the deployment will be uploaded over the course of the test. The instrumentatio...
Nelson, E. National Renewable Energy Laboratory
May 30, 2015
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
TEAMER: Tidal Turbine Test, Downeast Turbines, July 12, 2021
Downeast Turbines tested a tidal turbine prototype with novel rotor/channel system and lateral effluent discharge apparatus (LEDA), during five days of testing in the flume at Alden Lab. Three days of testing (July 12-14, 2021) focused on turbine power metrics of torque and rpm, w...
McBride, G. Downeast Turbines
Mar 26, 2022
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
HERO WEC V1 Upgrade 2023 Laboratory Testing (processed data)
The following submission includes processed laboratory data from NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of MATLAB workspaces. This dataset was created using NREL's Large Amplitude Motion Platform (LAMP) and collected between Aug...
Panzarella, J. et al National Renewable Energy Laboratory
Jan 01, 2024
12 Resources
0 Stars
Publicly accessible
12 Resources
0 Stars
Publicly accessible
SeaRAY WEC Preliminary Design and Test Planning
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides...
Hammagren, E. et al Columbia Power Technologies, Inc.
May 18, 2020
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
ALFA MHK Biological Monitoring Stationary Deployment South Energy Test Site, Newport, Oregon
Acoustic backscatter data from a WBAT operating at 70kHz deployed at PMEC-SETS from April to September of 2016. 180 pings were collected at 1Hz every two hours, as part of the Advanced Laboratory and Field Arrays (ALFA) for Marine Energy project.
Data was subject to preliminary pr...
Horne, J. Northwest National Marine Renewable Energy Center
Oct 01, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Direct-Drive Electrical Generator and PTO System for Flap-type Wave Energy Converters
Project and generator specifications and initial prototype test data for flap-type wave energy converters (WEC)
Englebretson, S. ABB Inc.
Mar 20, 2015
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Timeseries Data from the Experimental Testing of the OPI's Prototype Hydraulic Drivetrain.
Timeseries data from the experimental testing of the OPI's prototype hydraulic drivetrain. The data is provided in .mat file format. The units for the data can be found in the ReadMe included in the submission resources.
Mundon, T. Oscilla Power, Inc.
Nov 26, 2021
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Material Characterization Program
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber
The core objectives of this project is to improve the power capture of three different wave energy
conversion (WEC) devices by more than 50% using an advanced control system and validate the
attained improvements using wave tank and full scale testing. In parallel, we will bring a...
Previsic, M. et al Re Vision Consulting
Aug 26, 2020
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
CalWave WEC Open Water Demonstration Public Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Computational Fluid Dynamics Simulation of Oscylator cylinders
This is one of the computational fluid dynamics (CFD) simulations. The parameters for the test are in the info.txt file.
Taipale, J. Vortex Hydro Energy
Feb 07, 2017
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
Tidal Current Cross-flow Turbine Wake ADV and PIV Data
Measurements in the wake of a high-solidity cross-flow turbine in a laboratory flume obtained using Acoustic Doppler Velocimetry and Particle Image Velocimetry for the purposes of characterizing the turbine wake and comparing the methods.
Polagye, B. University of Washington
Dec 06, 2016
6 Resources
1 Stars
Publicly accessible
6 Resources
1 Stars
Publicly accessible
CalWave WEC Open Water Demonstration Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
1 Stars
Awaiting release
2 Resources
1 Stars
Awaiting release
Numerical Analysis of Two-Body Floating Attenuator WEC (Waveberg)
This TEAMER RFTS 9 award was used to develop a numerical model of the Waveberg floating attenuator wave energy converter (WEC) using the Wave Energy Converter-Simulator (WEC-Sim). The Waveberg is designed to generate power in the smaller waves (for wave heights of 1 2 meters) pred...
Wegener, P. DBA Waveberg Development
Mar 26, 2025
16 Resources
0 Stars
In curation
16 Resources
0 Stars
In curation
StingRAY Structural Optimization Final Technical Report Appendices
The protected data appendices to the public Final Technical Report.
The overall project objective is to materially decrease the leveled cost of energy (LCOE) of the Columbia Power (CPower) StingRAY utility-scale wave energy converter (WEC). This will be achieved by reducing stru...
Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Aug 05, 2020
16 Resources
0 Stars
Awaiting release
16 Resources
0 Stars
Awaiting release
TEAMER: Experimental Validation and Analysis of Deep Reinforcement Learning Control for Wave Energy Converters
Through this TEAMER project, Michigan Technological University (MTU) collaborated with Oregon State University (OSU) to test the performance of a Deep Reinforcement Learning (DRL) control in the wave tank. Unlike model-based controls, DRL control is model-free and can directly max...
Zou, S. et al Michigan Technological University
Mar 07, 2025
7 Resources
0 Stars
Awaiting curation
7 Resources
0 Stars
Awaiting curation
HydroAir Power Take Off Combined Design Report
The submission is the combined design report for the HydroAir Power Take Off (PTO). CAD drawings, circuit diagrams, design report, test plan, technical specifications and data sheets are included for the Main and auxiliary control cabinets and three-phase-synchronous-motor with a ...
Pearson, G. et al Dresser-Rand Company
Jun 26, 2015
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
TEAMER: FOSWEC Mooring Modeling and Analysis, Post Access Report and Data
Floating oscillating surge wave energy converters (FOSWECs) offer several advantages over bottom-hinged oscillating surge wave energy converters, including large wave potential at deep-water sites with fewer permitting and environmental concerns outside territorial waters. As a te...
Housner, S. et al Virginia Tech
Jun 14, 2022
10 Resources
0 Stars
Publicly accessible
10 Resources
0 Stars
Publicly accessible
RivGen Deployment Control System Specifications and Models, Igiugig, AK
Control System simulation models, case studies, and processing codes for analyzing field data. Raw data files included from VFD and SCADA.
MatLab and Simulink are required to open some data files and all model files.
Forbush, D. et al Ocean Renewable Power Company
Mar 21, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TidGen: Single Turbine System Performance Analysis
This document offers a detailed performance analysis of the Single Turbine System (STS) developed by ORPC in Cobscook Bay, Maine, in 2023. The report includes system descriptions, deployment, and planned instrumentation, alongside data collection strategies. The performance evalua...
McEntee, J. Ocean Renewable Power Company
Jan 11, 2024
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave Deep Ocean Basin Test Plan, Ireland
Documentation of CalWave's wave tank test plan (including test setup and overview) at the Deep Ocean Basin at Ringaskiddy, Cork, Ireland. Experimental tank testing of scaled prototype units will be conducted repeatedly throughout the design process to verify device performance for...
Boerner, T. et al CalWave Power Technologies Inc.
Oct 31, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Coordinated Control of Tidal Cross-flow Turbines
Initial laboratory experiments with coordinated phase control of cross-flow turbines in a dense array.
Polagye, B. University of Washington
Dec 06, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Composites Structural Testing
Seawater aging response was investigated in marine-grade glass/epoxy, glass/vinyl ester, carbon/epoxy and carbon/vinyl ester composites with respect to water uptake, interlaminar shear strength, flexural strength, tensile strength, and tensile fracture surface observations. The re...
Krumpe, A. ORPC Inc.
Jan 06, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC 1:50 Small Scale Tank Testing Plan
Detailed laboratory test plan for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Includes test points, materials and methods, and sensors/telemetry to be used. Includes schematics of test apparatus and sensor type and locations.
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 17, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible