Search MHK Data
Showing results 51 - 64 of 64.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible
TEAMER: Tidal Currents in San Juan Archipelago, Washington
Re-analyzed acoustic Doppler current profiler (ADCP) data originally collected by NOAA CO-OPS (Center for Operational Oceanographic Products and Services) and equivalent point data from Pacific Northwest National Laboratory's FVCOM (Finite Volume Community Ocean Model) model of th...
Polagye, B. et al University of Washington
Dec 15, 2022
3 Resources
0 Stars
Curated
3 Resources
0 Stars
Curated
HERO WEC Bills of Materials: WEC, RO System, and Submersible Pump
This submission includes detailed Bills of Materials for the NREL-designed and built Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), as well as the reverse osmosis assembly and submersible pump that are used in the HERO WEC.
The WEC file is specific to th...
Jenne, S. and Panzarella, J. National Renewable Energy Laboratory
Jan 01, 2024
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, WEC Geometry CAD
CAD files depicting the wetted geometry of the Centipod WEC used in numerical models during this project. This includes the wetted geometry of the point absorber body ('pod') and the WEC 'backbone'.
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 Electrical PTO Deployment Data and Analysis
This submission includes the processed and raw field electrical data from NREL's August 2022 HERO WEC (hydraulic and electric reverse osmosis wave energy converter) deployment at Jennette's Pier for the electrical PTO (power take-off).
Nakhai, A. et al National Renewable Energy Laboratory
Aug 12, 2022
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Quarterly Technical Report
Quarterly Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeli...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
H3 StingRAY Final Design and Technical Report
The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies' (C-Power) next-generation wave energy converter (WEC), the StingRAY H3. The H3 is a design iteration of C-Power's StingRAY WEC and is intended for electrical pow...
Prudell, J. and Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Sep 15, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Bench Testing Data and Report for an Early Prototype Pitch Resonator WEC
This dataset encompasses data and documentation from bench tests conducted on an early prototype of a "pitch resonator" wave energy converter (WEC). The testing aimed to validate numerical models and reduce risks associated with the pitch resonator concept, which is designed to co...
Coe, R. et al Sandia National Laboratories
Aug 09, 2024
4 Resources
0 Stars
Curated
4 Resources
0 Stars
Curated
Modeling the Integration of Marine Energy into Microgrids Wave Resource Assessment
This submission has wave resource assessments which were conducted for six locations based on IEC requirements using the DOE WPTO Hindcast data and MHKiT. The locations are chosen to provide varying wave climates and include PacWave South, OR; Wave Energy Testing Site (WETS), HI; ...
Mankle, H. and Robertson, B. University of Alaska Fairbanks
Jan 19, 2023
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Version 2 Tidal Energy Resource Characterization, Velocity and Turbulence Measurements, Cook Inlet, AK, 2021
Version 2 of MHKDR submission #475, which also contains the metadata for these measurements.
Files here are stored in netCDF4 format, which can be read in Python using the "netcdf4" or "xarray" packages or in MATLAB using the "ncread()" function.
Changes are as follows:
MWM1 (mi...
Kilcher, L. Pacific Northwest National Laboratory
Jul 01, 2021
9 Resources
1 Stars
Curated
9 Resources
1 Stars
Curated
Tidal Resource Data from Sequim Bay Inlet, WA, August 2020
Data from a Nortek Signature1000 deployed on a lander for 14 days in Aug 2020 in the entrance to Sequim Bay, WA. Raw data were processed using the DOLfYN python package and standardized using the ME Data Pipeline python package, tsdat version 0.2.12. Processed data were partitione...
McVey, J. and Cavagnaro, R. Pacific Northwest National Laboratory
Aug 13, 2020
18 Resources
1 Stars
Publicly accessible
18 Resources
1 Stars
Publicly accessible
2017 Western Passage Tidal Energy Resource Characterization Measurements
These data are from tidal resource characterization measurements collected between April and July 2017 in Western Passage near Eastport, Maine, USA.
The dataset contains the following four sub-datasets, each of which is described in more detail in the README.pdf.
1. A bottom-mou...
Kilcher, L. et al National Renewable Energy Laboratory
Jul 31, 2017
33 Resources
0 Stars
Curated
33 Resources
0 Stars
Curated
Tidal Energy Resource Characterization, Bottom Lander Measurements, Cook Inlet, AK, 2021
These datasets are from tidal resource characterization measurements collected on the Terrasond High Energy Oceanographic Mooring (THEOM) from 1 July 2021 to 30 August 2021 (60 days) in Cook Inlet, Alaska. The lander was deployed at 60.7207031 N, 151.4294998 W in ~50 m of water.
...
Kilcher, L. and McVey, J. National Renewable Energy Laboratory
Jul 01, 2021
25 Resources
0 Stars
Publicly accessible
25 Resources
0 Stars
Publicly accessible
Tidal Energy Resource Characterization, Velocity and Turbulence Measurements, Processed Data, Cook Inlet, AK, 2021
This submission contains processed datasets from a long-term deployment of 3 moorings and a transect survey of the proposed tidal energy site off the East Forelands in Cook Inlet, AK.
The long-term mooring datasets were created from 8 instruments mounted on a Terrasond High Ener...
McVey, J. and Kilcher, L. Pacific Northwest National Laboratory
Aug 31, 2021
28 Resources
1 Stars
Curated
28 Resources
1 Stars
Curated