Search MHK Data
Showing results 1 - 25 of 147.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Tidal Resource Data from Sequim Bay Inlet, WA, August 2020
Data from a Nortek Signature1000 deployed on a lander for 14 days in Aug 2020 in the entrance to Sequim Bay, WA. Raw data were processed using the DOLfYN python package and standardized using the ME Data Pipeline python package, tsdat version 0.2.12. Processed data were partitione...
McVey, J. and Cavagnaro, R. Pacific Northwest National Laboratory
Aug 13, 2020
18 Resources
1 Stars
Publicly accessible
18 Resources
1 Stars
Publicly accessible
Early Market Opportunity MHK Energy Site Identification Wave and Tidal Resources
This data was compiled for the 'Early Market Opportunity Hot Spot Identification' project. The data and scripts included were used in the 'MHK Energy Site Identification and Ranking Methodology' Reports (see resources below). The Python scripts will generate a set of results--base...
Kilcher, L. National Renewable Energy Laboratory
Apr 01, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Reference Model 1 Cost Breakdown (RM1: Tidal Current Turbine)
Contains the Reference Model 1 (RM1) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM1 device and multiple unit arrays. These spreadsheets are contained within an XLSX file and a spreadsheet editor such as Mi...
Neary, V. et al Sandia National Laboratories
Sep 30, 2014
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Admiralty Inlet Advanced Turbulence Measurements: Final Data and Code Archive
Data and code that is not already in a public location that is used in Kilcher, Thomson, Harding, and Nylund (2017) "Turbulence Measurements from Compliant Moorings Part II: Motion Correction" doi: 10.1175/JTECH-D-16-0213.1.
The links point to Python source code used in the publi...
Kilcher, L. et al National Renewable Energy Laboratory
Feb 01, 2011
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
RITE Gen5 KHPS Levelized Cost of Energy
Levelized Cost of Energy analysis for Verdant Power Gen5 KHPS utilizing annualized AEP based on actual energy generation at the RITE Project during 2020-21. The WEC devices analyzed include attenuator, point absorber, oscillating wave surge converter, oscillating water column, ove...
Corren, D. et al Verdant Power Inc.
Jun 22, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Acoustic Doppler Velocimeter (ADV) data from the University of New Hampshire Atlantic Marine Energy Center (UNH-AMEC ) Tidal Energy Test Site during a Perigean Spring Tide
The ADV measurements contained in this submission were taken on the floating turbine deployment platform (TDP) located at the Memorial Bridge in Portsmouth, NH. The measurements were conducted 11/4/2021-11/9/2021 with the fastest currents occurring on 11/7/2021. Along with the sub...
Bichanich, M. and Wosnik, M. University of New Hampshire, Atlantic Marine Energy Center (AMEC)
Nov 09, 2021
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
Coordinated Control of Tidal Cross-flow Turbines
Initial laboratory experiments with coordinated phase control of cross-flow turbines in a dense array.
Polagye, B. University of Washington
Dec 06, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Admiralty Inlet, WA Tidal Currents
Acoustic Doppler Current Profiler (ADCP) data from seafloor tripods in Admiralty Inlet, Puget Sound, Washington. Data collected from April 2009 through December 2012.
When using the data, please cite the J. Oceanic Eng. paper included in this submission, and please contact Jim Tho...
Thomson, J. Northwest National Marine Renewable Energy Center
Apr 01, 2009
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System LCOE Calculations and System Overview
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Admiralty Inlet Hub-Height Turbulence Measurements from June 2012
This data is from measurements at Admiralty Head, in Admiralty Inlet. The measurements were made using an IMU equipped ADV mounted on a mooring, the 'Tidal Turbulence Mooring' or 'TTM'. The inertial measurements from the IMU allows for removal of mooring motion in post processing....
Kilcher, L. National Renewable Energy Laboratory
Jun 18, 2012
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Development of Classification Systems for Wave Energy Resources and WEC Technologies
The submission includes wave resource classification reports, summary of classification statistics and regional trends, and data files with classification statistics for selected sites for extreme significant wave height. Two conference papers were uploaded that include classifica...
Neary, V. et al Sandia National Laboratories
Jun 30, 2017
5 Resources
0 Stars
Curated
5 Resources
0 Stars
Curated
MHK Levelized Cost of Energy (LCOE) Guidance and Techo Economic Analysis Materials
Useful information and tools for calculating the Levelized Cost of Energy (LCOE) and MHK Cost Breakdown Structure. Includes a structure for calculating the capital expenditures and operating costs of a marine energy technology or device, reference resource data for both wave and ...
Jenne, S. and Baca, E. National Renewable Energy Laboratory
Nov 08, 2019
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
2017 Western Passage Tidal Energy Resource Characterization Measurements
These data are from tidal resource characterization measurements collected between April and July 2017 in Western Passage near Eastport, Maine, USA.
The dataset contains the following four sub-datasets, each of which is described in more detail in the README.pdf.
1. A bottom-mou...
Kilcher, L. et al National Renewable Energy Laboratory
Jul 31, 2017
33 Resources
0 Stars
Curated
33 Resources
0 Stars
Curated
RITE Gen5 KHPS Performance Period B
Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over 16 days in May 2021 during Period B operation. Along with performance data, the data includes setup data, project metadata, and char...
Corren, D. et al Verdant Power Inc.
Dec 23, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
RITE Gen5 KHPS Performance Period A
Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over Period A which was a 39 day span ending on 11/12/2021. This data was collected under the European Marine Energy Centre (EMEC) power ...
Colby, J. et al Verdant Power Inc.
Nov 12, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Verdant Power Gen5 KHPS and TriFrame System Content Models
This submission includes the Component Content Model for Verdant Power TriFrame and the System Content Model for Verdant Power TriFrame + 3 Gen5 KHPS Turbines. The TriFrame is the foundation component of the system, which consists of a TriFrame + 3 Gen5 KHPS Turbines (TF+3T).
Corren, D. et al Verdant Power Inc.
Jul 05, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Verdant Power TriFrame, Gen5 KHPS Turbine, and BOP System Content Models
This submission includes System Content Models with data following manufacture for the Verdant Power TriFrame, Gen5 Kinetic Hydropower System (KHPS) Turbines, and Balance of Plant (BOP). The TriFrame installs 3 Gen5 KHPS Turbines. The BOP system controls the turbines and interconn...
Corren, D. et al Verdant Power Inc.
Mar 31, 2020
3 Resources
0 Stars
Awaiting release
3 Resources
0 Stars
Awaiting release
TEAMER: Drifting Hydrophone System Block Diagram and Pre-Amplifier Calibrations
This data release is part of TEAMER RFTS 2, where the Cooperative Institute for Marine Resources Studies (CIMRS) at Oregon State University is performing hardware and software development and integration of four newly designed drifting hydrophone systems for underwater noise measu...
Turnbull, J. et al Pacific Marine Energy Center (PMEC) / PacWave Oregon State University
Feb 26, 2024
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Admiralty Inlet Advanced Turbulence Measurements: May 2015
This data is from measurements at Admiralty Head, in Admiralty Inlet (Puget Sound) in May of 2015. The measurements were made using Inertial Motion Unit (IMU) equipped ADVs mounted on a 'StableMoor' (Manufacturer: DeepWater Buoyancy) buoy and a Tidal Turbulence Mooring (TTM). Thes...
Kilcher, L. National Renewable Energy Laboratory
May 18, 2015
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Scaled Tank Test Design and Results
Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Rig Structural Analysis Results. This is the detailed documentation for scaled device testing in a tow tank, including models, drawings, presentations, cost of energy analysis, and structural analysis. This datase...
Swales, H. et al Dehlsen Associates, LLC
Jun 03, 2015
46 Resources
0 Stars
Publicly accessible
46 Resources
0 Stars
Publicly accessible
Admiralty Inlet Advanced Turbulence Measurements: June 2014
This data is from measurements at Admiralty Head, in Admiralty Inlet (Puget Sound) in June of 2014. The measurements were made using Inertial Motion Unit (IMU) equipped ADVs mounted on Tidal Turbulence Mooring's (TTMs). The TTM positions the ADV head above the seafloor to make mid...
Kilcher, L. National Renewable Energy Laboratory
Jun 30, 2014
26 Resources
0 Stars
Publicly accessible
26 Resources
0 Stars
Publicly accessible
CalWave Open Water Demo Budget Period 1 Reports
The objective of the project is to advance the Technology Readiness Level (TRL) of the Wave Energy Converter (WEC) developed by CalWave Wave Power Technologies Inc (CalWave) through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstr...
Boerner, T. et al CalWave Power Technologies Inc.
Jun 03, 2019
8 Resources
0 Stars
Awaiting release
8 Resources
0 Stars
Awaiting release
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Wave Energy Prize Wave Calibration Data for the 1:20 Scale Testing at MASK
Time series data, sensor layout, and wave calibration summaries for the wave height measurements for the 10 calibration sea states for the 1:20 scale testing of the Wave Energy Prize (WEP) at the US Navy's Maneuvering and Seakeeping (MASK) Basin at the Naval Surface Warfare Center...
Driscoll, R. National Renewable Energy Laboratory
May 08, 2017
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
LCOE Baseline for RME Surge WEC Device
This submission includes all the data to support an LCOE baseline assessment for the Resolute Marine Energy (RME) Surge WEC device.
Previsic, M. et al Re Vision Consulting
Jul 19, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible