Search MHK Data
Showing results 101 - 105 of 105.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
HERO WEC V1 Upgrade 2023 Laboratory Testing (processed data)
The following submission includes processed laboratory data from NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of MATLAB workspaces. This dataset was created using NREL's Large Amplitude Motion Platform (LAMP) and collected between Aug...
Panzarella, J. et al National Renewable Energy Laboratory
Jan 01, 2024
12 Resources
0 Stars
Publicly accessible
12 Resources
0 Stars
Publicly accessible
HERO WEC 2024 Hydraulic Configuration Deployment Data
The following submission includes raw and processed data from the in water deployment of NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of parquet files, TDMS files, CSV files, bag files and MATLAB workspaces. This dataset was collected...
Jenne, S. et al National Renewable Energy Laboratory
Mar 14, 2024
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Oscylator-4 Energy Converter St. Clair River Installation Data 2016
Data collected during the 2016 St. Clair River installation of the Oscylator-4 energy converter.
Taipale, J. and Kim, E. Vortex Hydro Energy
Jul 20, 2016
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible
Fish Detection AI, optic and sonar-trained object detection models
The Fish Detection AI project aims to improve the efficiency of fish monitoring around marine energy facilities to comply with regulatory requirements. Despite advancements in computer vision, there is limited focus on sonar images, identifying small fish with unlabeled data, and ...
Slater, K. et al Water Power Technology Office
Jun 25, 2014
12 Resources
0 Stars
In progress
12 Resources
0 Stars
In progress
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible