Search MHK Data
Showing results 126 - 150 of 224.
Show
results per page.
Order by:
Available Now:
Technologies
Topics
Signature Projects
Collection Method
Data Type
Single Turbine Test Procedure and Data Acquisition Plan, Rev. B
The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. Installation of the STS will also test the deployment system and methods for the full scale TD80. This document describes the te...
Hayes, N. ORPC Inc.
Apr 13, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
M3 Wave DMP/APEX WEC Survival Test Report
This survival test report for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," summarizes the key tank test data, numerical model results, input test conditions (both numerical and tank testing), and crosses these items with three designs of t...
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 31, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
RANS Simulation VBM of Single Lab Scaled DOE RM1 MHK Turbine
Attached are the .cas and .dat files for the Reynolds Averaged Navier-Stokes (RANS) simulation of a single lab-scaled DOE RM1 turbine implemented in ANSYS FLUENT CFD-package.
The lab-scaled DOE RM1 is a re-design geometry, based of the full scale DOE RM1 design, producing same po...
Javaherchi, T. et al University of Washington (NNMREC)
Apr 15, 2014
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
LCOE and Baseline Data for ORPC's RivGen 1.F River Power System
Base data and documentation of LCOE calculations for ORPC's RivGen 1.F Power System, demonstrated in the Kvichak River at Igiugig, Alaska in 2015.
Salmon, A. Igiugig Village Council
Oct 31, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
CalWave Design for PacWave Preliminary Design Phase Risk Management Plan
The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan ...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
2 Resources
0 Stars
Awaiting release
2 Resources
0 Stars
Awaiting release
Wave Energy Prize Wave Calibration Data for the 1:20 Scale Testing at MASK
Time series data, sensor layout, and wave calibration summaries for the wave height measurements for the 10 calibration sea states for the 1:20 scale testing of the Wave Energy Prize (WEP) at the US Navy's Maneuvering and Seakeeping (MASK) Basin at the Naval Surface Warfare Center...
Driscoll, R. National Renewable Energy Laboratory
May 08, 2017
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Quarterly Technical Report
Quarterly Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeli...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TidGen MHK Generator Composite Fatigue Analysis Procedure
A procedure was described for performing a fatigue analysis of composite foils for an MHK generator. The steps included generating load data, S-N (Stress versus Number of cycles to failure) diagrams through fatigue testing, cycle counts, damage versus load, and cumulative damage. ...
Krumpe, A. ORPC Inc.
Apr 14, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Development Test Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TidGen: Single Turbine Subsystem (STS) Device Installation, Deployment, Retrieval, and Removal Procedures
This document provides the process details for installation of the Single Turbine Subsystem (STS) device from the assembly laydown location to the deployed location in Eastport, ME. These procedures will be conducted not only during initial deployment, but also during maintenance ...
Martin, T. Ocean Renewable Power Company
Feb 20, 2023
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
CalWave WEC Open Water Demonstration Final Test Report
The objective of this project is to advance the Technology Readiness Level of the x1 Wave Energy Converter (WEC) developed by CalWave Power
Technologies Inc. through advanced numerical simulations, dynamic hardware tests, and ultimately a scaled open water demonstration deployment...
Boerner, T. et al CalWave Power Technologies Inc.
Nov 30, 2022
2 Resources
1 Stars
Curated
2 Resources
1 Stars
Curated
Admiralty Inlet Advanced Turbulence Measurements: May 2015
This data is from measurements at Admiralty Head, in Admiralty Inlet (Puget Sound) in May of 2015. The measurements were made using Inertial Motion Unit (IMU) equipped ADVs mounted on a 'StableMoor' (Manufacturer: DeepWater Buoyancy) buoy and a Tidal Turbulence Mooring (TTM). Thes...
Kilcher, L. National Renewable Energy Laboratory
May 18, 2015
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
Timeseries Data from the Experimental Testing of the OPI's Prototype Hydraulic Drivetrain.
Timeseries data from the experimental testing of the OPI's prototype hydraulic drivetrain. The data is provided in .mat file format. The units for the data can be found in the ReadMe included in the submission resources.
Mundon, T. Oscilla Power, Inc.
Nov 26, 2021
4 Resources
0 Stars
Awaiting release
4 Resources
0 Stars
Awaiting release
Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications
Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.
Amon, E. Columbia Power Technologies, Inc.
Jul 19, 2019
17 Resources
0 Stars
Awaiting release
17 Resources
0 Stars
Awaiting release
Advanced TidGen Power System Composites Structural Testing
Seawater aging response was investigated in marine-grade glass/epoxy, glass/vinyl ester, carbon/epoxy and carbon/vinyl ester composites with respect to water uptake, interlaminar shear strength, flexural strength, tensile strength, and tensile fracture surface observations. The re...
Krumpe, A. ORPC Inc.
Jan 06, 2020
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, buil...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Deployment and Mooring System
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Preliminary Turbine Hydrodynamic Design
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System 2.0 Final BP1 Turbine Design Technical Report
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Final System Design Technical Report
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
TidGen: Single Turbine Test Procedure and Data Acquisition Plan
The included report details the procedure for conducting a performance test of a single turbine for the Advanced TidGen system. The TidGen80 Single Turbine System (TD80-STS or STS) will be used to test the power production performance of a single turbine in a tidal environment. In...
Hayes, N. Ocean Renewable Power Company
Jun 03, 2021
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
TidGen: Single Turbine System Mooring Design Overview for Cobscook Bay, Maine
This document summarizes the design of the Single Turbine Subsystem (STS) 2-point mooring system in Cobscook Bay, ME. The TidGen80 (TD80) is a mid-water column tidal energy device being developed by ORPC. Initial testing will utilize a previously installed Bottom Support Frame (BS...
Scott, M. Ocean Renewable Power Company
Oct 19, 2022
1 Resources
0 Stars
Awaiting release
1 Resources
0 Stars
Awaiting release
Azura WEC 1/15th Wave Tank Test Data
Test data from the 1/15th Wave Tank Tests of the Azura performed in 2017/2018 to validate the power performance and survivability of the Azura Design developed by Northwest Energy Innovations (NWEI) planned for deployment at the US Navy's Wave Energy Test Site. Raw and processed d...
Ling, B. Northwest Energy Innovations
Feb 02, 2018
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
MASK2B Initial Results from Wave Tank Test of Closed-Loop WEC Control
This dataset covers the MASK2B wave tank experiment focused on a more complete study of one degree of freedom (1DOF) control of the WEC was considered, including maximization of electrical power, multi-objective performance mapping, and implementation of a novel predictionless con...
Coe, R. et al Sandia National Laboratories
May 25, 2018
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible